X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505110407000

Well Details

Well ID: 0505110407000
Loading map...
Location: 00/07-04-050-11W5/0
Location Alias: 00/07-04-50-11 W5M
Location Alias 2: 00/07-04-050-11 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 04
County/Municipality: Brazeau County
Well Name: PENN WEST PEMBINA 7-4-50-11
Operator Name: Obsidian Energy Ltd.
License Number: 0474578
License Date: 2015-02-10
License Status: Amended
Spud Date: 2015-07-17
Final Drill Date: 2015-07-24
Well Total Depth: 3829.00 m
Surface Hole Latitude: 53.283910
Surface Hole Longitude: -115.514159

For data sources see[1][2]

Well History

Date Event
2015-02-10 Obtained License
2015-07-18 Surface Casing Operation Performed
2015-07-20 Direction Drilling Operation Performed - Deviate
2015-07-20 Direction Drilling Operation Performed - Horizontal
2015-07-20 Well Log Performed
2015-07-24 Finished Drilling
2015-07-24 Well Log Performed
2015-07-24 Well Mode changed to Drilled and Cased
2015-07-26 Production Casing Operation Performed
2015-07-27 Rig Released
2015-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-10 Perforation Treatment Performed - Open-Hole Completion
2015-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-18 Well Began Production
2015-08-18 Well Fluid changed to Crude Oil
2015-08-18 Well Log Performed
2015-08-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-17 Precision Drilling Corporation 196 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-20 1466.00 Deviate (5 - 79 degrees)
2015-07-20 1848.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-10 Open Hole/Barefoot Completion 3815.00 3829.00 0
2015-08-17 Multi-Stage Fracture 3080.50 3080.60 0
2015-08-17 Multi-Stage Fracture 2994.90 2995.00 0
2015-08-17 Multi-Stage Fracture 2909.40 2909.50 0
2015-08-17 Multi-Stage Fracture 2823.80 2823.90 0
2015-08-17 Multi-Stage Fracture 2738.30 2738.40 0
2015-08-17 Multi-Stage Fracture 2654.00 2654.10 0
2015-08-17 Multi-Stage Fracture 2568.40 2568.50 0
2015-08-17 Multi-Stage Fracture 2482.80 2482.90 0
2015-08-18 Multi-Stage Fracture 2397.20 2397.30 0
2015-08-18 Multi-Stage Fracture 2311.60 2311.70 0
2015-08-10 Multi-Stage Fracture 3765.50 3765.60 0
2015-08-18 Multi-Stage Fracture 2212.00 2212.10 0
2015-08-18 Multi-Stage Fracture 2112.30 2112.40 0
2015-08-18 Multi-Stage Fracture 2012.70 2012.80 0
2015-08-16 Multi-Stage Fracture 3679.50 3679.60 0
2015-08-16 Multi-Stage Fracture 3593.80 3593.90 0
2015-08-16 Multi-Stage Fracture 3508.20 3508.30 0
2015-08-16 Multi-Stage Fracture 3422.70 3422.80 0
2015-08-17 Multi-Stage Fracture 3337.10 3337.20 0
2015-08-17 Multi-Stage Fracture 3251.50 3251.60 0
2015-08-17 Multi-Stage Fracture 3165.90 3166.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-10 2015-08-18 1,744 3,184 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.1039 N/A
water Not Available 100 86.9726 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 9.5963 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0108 N/A
dibromoacetonitrile 3252-43-5 100 0.0108 N/A
non-hazardous ingredients Not Available 100 0.0108 N/A
polyethylene glycol 25322-68-3 100 0.0108 N/A
sodium bromide 7647-15-6 100 0.0108 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0093 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1435 N/A
non-hazardous ingredients Not Available 100 0.1435 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0443 N/A
propylene glycol 57-55-6 100 0.0443 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.119 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.119 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.119 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-04 2015-08-18 Surface Water - Runoff 3804

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2789 0.0 0.0 0.0
2016 8763 0.0 0.0 0.0
2017 8443 0.0 0.0 0.0
2018 8732 0.0 0.0 0.0
2019 8192 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-27 No Incident Encountered 0.00 0.00
2015-08-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References