X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505111208000

Well Details

Well ID: 0505111208000
Loading map...
Location: 00/08-12-050-11W5/0
Location Alias: 00/08-12-50-11 W5M
Location Alias 2: 00/08-12-050-11 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 12
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 8-12-50-11
Operator Name: Whitecap Resources Inc.
License Number: 0019672
License Date: 1960-09-12
License Status: Issued
Spud Date: 1960-09-27
Final Drill Date: 1960-10-05
Well Total Depth: 1720.60 m
Surface Hole Latitude: 53.299733
Surface Hole Longitude: -115.467544

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-12 Obtained License
1960-10-05 Finished Drilling
1960-10-05 Well Mode changed to Drilled and Cased
1960-10-06 Production Casing Operation Performed
1960-10-12 Perforation Treatment Performed - Jet Perforation
1960-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-13 Perforation Treatment Performed - Fractured
1960-11-17 Well Began Production
1960-11-17 Well Fluid changed to Crude Oil
1960-11-17 Well Mode changed to Pumping
1964-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-02 Perforation Treatment Performed - Cement Squeeze
1964-10-03 Perforation Treatment Performed - Selective Jet Perforations
1964-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-04 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-12 Perforation 1684.60 1685.20 13
1964-10-03 Selective Jet Perforations 1688.60 1688.90 0
1964-10-03 Selective Jet Perforations 1692.60 1693.50 0
1964-10-04 Acid Treatment 1683.70 1693.80 0
1964-10-04 Fracture 1683.70 1693.80 0
1960-10-12 Perforation 1686.20 1689.80 13
1960-10-12 Perforation 1692.90 1693.80 13
1960-10-13 Acid Treatment 1684.60 1693.80 0
1960-10-13 Fracture 1684.60 1693.80 0
1964-10-02 Acid Treatment 1684.60 1693.80 0
1964-10-02 Cement Squeeze 1684.60 1693.80 0
1964-10-03 Selective Jet Perforations 1683.70 1684.90 0
1964-10-03 Selective Jet Perforations 1686.20 1686.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8579 0.0 0.0 0.0
1968 8625 0.0 0.0 0.0
1969 8591 0.0 0.0 0.0
1970 8627 0.0 0.0 0.0
1971 8687 0.0 0.0 0.0
1972 8148 0.0 0.0 0.0
1973 8711 0.0 0.0 0.0
1974 8615 0.0 0.0 0.0
1975 8567 0.0 0.0 0.0
1976 8591 0.0 0.0 0.0
1977 8663 0.0 0.0 0.0
1978 8087 0.0 0.0 0.0
1979 8351 0.0 0.0 0.0
1980 8448 0.0 0.0 0.0
1981 7727 0.0 0.0 0.0
1982 7392 0.0 0.0 0.0
1983 7679 0.0 0.0 0.0
1984 8255 0.0 0.0 0.0
1985 7209 0.0 0.0 0.0
1986 7641 0.0 0.0 0.0
1987 6553 0.0 0.0 0.0
1988 7668 0.0 0.0 0.0
1989 6601 0.0 0.0 0.0
1990 6582 0.0 0.0 0.0
1991 8207 0.0 0.0 0.0
1992 8303 0.0 0.0 0.0
1993 8180 0.0 0.0 0.0
1994 8093 0.0 0.0 0.0
1995 8003 0.0 0.0 0.0
1996 8339 0.0 0.0 0.0
1997 7967 0.0 0.0 0.0
1998 8537 0.0 0.0 0.0
1999 8243 0.0 0.0 0.0
2000 8543 0.0 0.0 0.0
2001 8591 0.0 0.0 0.0
2002 8615 0.0 0.0 0.0
2003 8543 0.0 0.0 0.0
2004 8231 0.0 0.0 0.0
2005 8391 0.0 0.0 0.0
2006 7331 0.0 0.0 0.0
2007 7751 0.0 0.0 0.0
2008 8666 0.0 0.0 0.0
2009 5047 0.0 0.0 0.0
2010 930 0.0 0.0 0.0
2011 8091 0.0 0.0 0.0
2012 7173 0.0 0.0 0.0
2013 3173 0.0 0.0 0.0
2014 6296 0.0 0.0 0.0
2015 8596 0.0 0.0 0.0
2016 8483 0.0 0.0 0.0
2017 8503 0.0 0.0 0.0
2018 7896 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References