X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505113506000

Well Details

Well ID: 0505113506000
Loading map...
Location: 00/06-35-050-11W5/0
Location Alias: 00/06-35-50-11 W5M
Location Alias 2: 00/06-35-050-11 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 11
Section: 35
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 6-35-50-11
Operator Name: Whitecap Resources Inc.
License Number: 0028012
License Date: 1965-03-19
License Status: Suspension
Spud Date: 1965-03-24
Final Drill Date: 1965-04-04
Well Total Depth: 1722.10 m
Surface Hole Latitude: 53.357117
Surface Hole Longitude: -115.502630

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-19 Obtained License
1965-04-04 Finished Drilling
1965-04-04 Well Mode changed to Drilled and Cased
1965-04-05 Production Casing Operation Performed
1965-05-25 Perforation Treatment Performed - Selective Jet Perforations
1965-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-06-18 Perforation Treatment Performed - Fractured
1965-07-12 Well Began Production
1965-07-12 Well Fluid changed to Crude Oil
1965-07-12 Well Mode changed to Flowing
1966-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-12-18 Perforation Treatment Performed - Fractured
1973-08-09 Well Fluid changed to Crude Oil
1973-08-09 Well Mode changed to Pumping
2001-01-30 Perforation Treatment Performed - Jet Perforation
2001-01-30 Well Log Performed
2001-01-31 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-05-25 Selective Jet Perforations 1694.70 1695.00 0
2001-01-31 Fracture 1694.70 1701.40 0
1965-05-25 Selective Jet Perforations 1695.60 1695.90 0
1965-05-25 Selective Jet Perforations 1696.50 1699.90 0
1965-05-25 Selective Jet Perforations 1700.80 1701.40 0
1965-06-18 Acid Treatment 1694.70 1701.40 0
1965-06-18 Fracture 1694.70 1701.40 0
1966-03-03 Acid Treatment 1694.70 1701.40 0
1967-12-18 Fracture 1694.70 1701.40 0
2001-01-30 Perforation 1699.00 1701.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8283 0.0 0.0 0.0
1968 8093 0.0 0.0 0.0
1969 8632 0.0 0.0 0.0
1970 8654 0.0 0.0 0.0
1971 8719 0.0 0.0 0.0
1972 8776 0.0 0.0 0.0
1973 8586 0.0 0.0 0.0
1974 8195 0.0 0.0 0.0
1975 8551 0.0 0.0 0.0
1976 8595 0.0 0.0 0.0
1977 8674 0.0 0.0 0.0
1978 8467 0.0 0.0 0.0
1979 8372 0.0 0.0 0.0
1980 8635 0.0 0.0 0.0
1981 8101 0.0 0.0 0.0
1982 7267 0.0 0.0 0.0
1983 8568 0.0 0.0 0.0
1984 8484 0.0 0.0 0.0
1985 8718 0.0 0.0 0.0
1986 8668 0.0 0.0 0.0
1987 8675 0.0 0.0 0.0
1988 8150 0.0 0.0 0.0
1989 8517 0.0 0.0 0.0
1990 8543 0.0 0.0 0.0
1991 8088 0.0 0.0 0.0
1992 8220 0.0 0.0 0.0
1993 8221 0.0 0.0 0.0
1994 8512 0.0 0.0 0.0
1995 8603 0.0 0.0 0.0
1996 7860 0.0 0.0 0.0
1997 8341 0.0 0.0 0.0
1998 8628 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8465 0.0 0.0 0.0
2001 8410 0.0 0.0 0.0
2002 8066 0.0 0.0 0.0
2003 8507 0.0 0.0 0.0
2004 8423 0.0 0.0 0.0
2005 8639 0.0 0.0 0.0
2006 8540 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8710 0.0 0.0 0.0
2009 6952 0.0 0.0 0.0
2011 1940 0.0 0.0 0.0
2012 6992 0.0 0.0 0.0
2013 1393 0.0 0.0 0.0
2014 4716 0.0 0.0 0.0
2015 8668 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8681 0.0 0.0 0.0
2019 8747 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[5]

References