X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505120104000

Well Details

Well ID: 0505120104000
Loading map...
Location: 00/04-01-050-12W5/0
Location Alias: 00/04-01-50-12 W5M
Location Alias 2: 00/04-01-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 4-1-50-12
Operator Name: Ridgeback Resources Inc.
License Number: 0433093
License Date: 2011-04-21
License Status: Issued
Spud Date: 2011-08-10
Final Drill Date: 2011-08-18
Well Total Depth: 3509.00 m
Surface Hole Latitude: 53.296407
Surface Hole Longitude: -115.628965

For data sources see[1][2]

Well History

Date Event
2011-04-21 Obtained License
2011-08-11 Surface Casing Operation Performed
2011-08-11 Well Log Performed
2011-08-12 Well Log Performed
2011-08-13 Direction Drilling Operation Performed - Horizontal
2011-08-18 Finished Drilling
2011-08-18 Well Mode changed to Drilled and Cased
2011-08-20 Perforation Treatment Performed - Open-Hole Completion
2011-08-20 Production Casing Operation Performed
2011-08-20 Rig Released
2011-09-10 Well Log Performed
2011-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-04 Well Began Production
2011-10-04 Well Fluid changed to Crude Oil
2011-10-04 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-13 1413.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-20 Open Hole/Barefoot Completion 3497.00 3509.00 0
2011-10-02 Multi-Stage Fracture 2878.10 2878.20 0
2011-10-03 Multi-Stage Fracture 2801.20 2801.30 0
2011-10-03 Multi-Stage Fracture 2727.90 2728.00 0
2011-10-03 Multi-Stage Fracture 2653.90 2654.00 0
2011-10-03 Multi-Stage Fracture 2579.70 2579.80 0
2011-10-03 Multi-Stage Fracture 2504.80 2504.90 0
2011-10-03 Multi-Stage Fracture 2430.60 2430.70 0
2011-10-03 Multi-Stage Fracture 2354.60 2354.70 0
2011-10-03 Multi-Stage Fracture 2279.80 2279.90 0
2011-10-03 Multi-Stage Fracture 2204.40 2204.50 0
2011-10-02 Multi-Stage Fracture 3471.20 3471.30 0
2011-10-03 Multi-Stage Fracture 2129.90 2130.00 0
2011-10-03 Multi-Stage Fracture 2054.80 2054.90 0
2011-10-02 Multi-Stage Fracture 3404.80 3404.90 0
2011-10-02 Multi-Stage Fracture 3329.00 3329.10 0
2011-10-02 Multi-Stage Fracture 3254.90 3255.00 0
2011-10-02 Multi-Stage Fracture 3180.20 3180.30 0
2011-10-02 Multi-Stage Fracture 3104.20 3104.30 0
2011-10-02 Multi-Stage Fracture 3030.80 3030.90 0
2011-10-02 Multi-Stage Fracture 2954.60 2954.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1538 0.0 0.0 0.0
2012 8593 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 8484 0.0 0.0 0.0
2016 8731 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 8756 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[6]

References