If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505120104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.296407,"lon":-115.628965,"icon":""}]} |
Location: 00/04-01-050-12W5/0 | |
Location Alias: 00/04-01-50-12 W5M | |
Location Alias 2: 00/04-01-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 4-1-50-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0433093 | |
License Date: 2011-04-21 | |
License Status: Issued | |
Spud Date: 2011-08-10 | |
Final Drill Date: 2011-08-18 | |
Well Total Depth: 3509.00 m | |
Surface Hole Latitude: 53.296407 | |
Surface Hole Longitude: -115.628965 |
Date | Event |
---|---|
2011-04-21 | Obtained License |
2011-08-11 | Surface Casing Operation Performed |
2011-08-11 | Well Log Performed |
2011-08-12 | Well Log Performed |
2011-08-13 | Direction Drilling Operation Performed - Horizontal |
2011-08-18 | Finished Drilling |
2011-08-18 | Well Mode changed to Drilled and Cased |
2011-08-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-20 | Production Casing Operation Performed |
2011-08-20 | Rig Released |
2011-09-10 | Well Log Performed |
2011-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-04 | Well Began Production |
2011-10-04 | Well Fluid changed to Crude Oil |
2011-10-04 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-13 | 1413.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-20 | Open Hole/Barefoot Completion | 3497.00 | 3509.00 | 0 |
2011-10-02 | Multi-Stage Fracture | 2878.10 | 2878.20 | 0 |
2011-10-03 | Multi-Stage Fracture | 2801.20 | 2801.30 | 0 |
2011-10-03 | Multi-Stage Fracture | 2727.90 | 2728.00 | 0 |
2011-10-03 | Multi-Stage Fracture | 2653.90 | 2654.00 | 0 |
2011-10-03 | Multi-Stage Fracture | 2579.70 | 2579.80 | 0 |
2011-10-03 | Multi-Stage Fracture | 2504.80 | 2504.90 | 0 |
2011-10-03 | Multi-Stage Fracture | 2430.60 | 2430.70 | 0 |
2011-10-03 | Multi-Stage Fracture | 2354.60 | 2354.70 | 0 |
2011-10-03 | Multi-Stage Fracture | 2279.80 | 2279.90 | 0 |
2011-10-03 | Multi-Stage Fracture | 2204.40 | 2204.50 | 0 |
2011-10-02 | Multi-Stage Fracture | 3471.20 | 3471.30 | 0 |
2011-10-03 | Multi-Stage Fracture | 2129.90 | 2130.00 | 0 |
2011-10-03 | Multi-Stage Fracture | 2054.80 | 2054.90 | 0 |
2011-10-02 | Multi-Stage Fracture | 3404.80 | 3404.90 | 0 |
2011-10-02 | Multi-Stage Fracture | 3329.00 | 3329.10 | 0 |
2011-10-02 | Multi-Stage Fracture | 3254.90 | 3255.00 | 0 |
2011-10-02 | Multi-Stage Fracture | 3180.20 | 3180.30 | 0 |
2011-10-02 | Multi-Stage Fracture | 3104.20 | 3104.30 | 0 |
2011-10-02 | Multi-Stage Fracture | 3030.80 | 3030.90 | 0 |
2011-10-02 | Multi-Stage Fracture | 2954.60 | 2954.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1538 | 0.0 | 0.0 | 0.0 |
2012 | 8593 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8615 | 0.0 | 0.0 | 0.0 |
2015 | 8484 | 0.0 | 0.0 | 0.0 |
2016 | 8731 | 0.0 | 0.0 | 0.0 |
2017 | 8701 | 0.0 | 0.0 | 0.0 |
2018 | 8573 | 0.0 | 0.0 | 0.0 |
2019 | 8756 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[6]