X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505120109000

Well Details

Well ID: 0505120109000
Loading map...
Location: 00/09-01-050-12W5/0
Location Alias: 00/09-01-50-12 W5M
Location Alias 2: 00/09-01-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 01
County/Municipality: Yellowhead County
Well Name: BACCALIEU 102 HZ PEMBINA 9-1-50-12
Operator Name: Baccalieu Energy Inc.
License Number: 0465265
License Date: 2014-02-21
License Status: Amended
Spud Date: 2014-02-28
Final Drill Date: 2014-03-12
Well Total Depth: 4095.00 m
Surface Hole Latitude: 53.309855
Surface Hole Longitude: -115.611760

For data sources see[1][2]

Well History

Date Event
2014-02-21 Obtained License
2014-02-28 Surface Casing Operation Performed
2014-03-03 Direction Drilling Operation Performed - Deviate
2014-03-04 Direction Drilling Operation Performed - Horizontal
2014-03-05 Intermediate Casing Operation Performed
2014-03-06 Well Log Performed
2014-03-12 Finished Drilling
2014-03-12 Well Mode changed to Drilled and Cased
2014-03-13 Well Log Performed
2014-03-15 Liner Casing Operation Performed
2014-03-16 Rig Released
2014-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-08 Well Began Production
2014-05-08 Well Fluid changed to Crude Oil
2014-05-08 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-03-03 1528.00 Deviate (5 - 79 degrees)
2014-03-04 1905.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-05-07 Multi-Stage Fracture 4050.60 4050.70 0
2014-05-07 Multi-Stage Fracture 3401.20 3401.30 0
2014-05-07 Multi-Stage Fracture 3328.80 3328.90 0
2014-05-07 Multi-Stage Fracture 3255.60 3255.70 0
2014-05-07 Multi-Stage Fracture 3183.30 3183.40 0
2014-05-07 Multi-Stage Fracture 3110.50 3110.60 0
2014-05-07 Multi-Stage Fracture 3037.10 3037.20 0
2014-05-07 Multi-Stage Fracture 2965.90 2966.00 0
2014-05-07 Multi-Stage Fracture 2893.00 2893.10 0
2014-05-07 Multi-Stage Fracture 2821.50 2821.60 0
2014-05-07 Multi-Stage Fracture 2752.30 2752.40 0
2014-05-07 Multi-Stage Fracture 3975.70 3975.80 0
2014-05-07 Multi-Stage Fracture 2681.40 2681.50 0
2014-05-07 Multi-Stage Fracture 2608.70 2608.80 0
2014-05-07 Multi-Stage Fracture 2536.80 2536.90 0
2014-05-07 Multi-Stage Fracture 2465.20 2465.30 0
2014-05-07 Multi-Stage Fracture 2393.20 2393.30 0
2014-05-07 Multi-Stage Fracture 2321.90 2322.00 0
2014-05-07 Multi-Stage Fracture 2249.80 2249.90 0
2014-05-07 Multi-Stage Fracture 2178.00 2178.10 0
2014-05-07 Multi-Stage Fracture 2107.40 2107.50 0
2014-05-07 Multi-Stage Fracture 3904.10 3904.20 0
2014-05-07 Multi-Stage Fracture 3834.00 3834.10 0
2014-05-07 Multi-Stage Fracture 3762.90 3763.00 0
2014-05-07 Multi-Stage Fracture 3691.60 3691.70 0
2014-05-07 Multi-Stage Fracture 3618.80 3618.90 0
2014-05-07 Multi-Stage Fracture 3547.00 3547.10 0
2014-05-07 Multi-Stage Fracture 3474.60 3474.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-07 2014-05-07 1,793 3,967 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.0676 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 1.7781 N/A
Crystalline silica. quartz 14808-60-7 100 1.7781 N/A
Iron Oxide 1309-37-1 100 1.7781 N/A
Titanium Oxide 13463-67-7 100 1.7782 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 9.3758 N/A
Crystalline silica. quartz 14808-60-7 100 9.3758 N/A
Iron Oxide 1309-37-1 100 9.3759 N/A
Titanium Oxide 13463-67-7 100 9.3759 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0126 N/A
Water 7732-18-5 100 0.0126 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.1833 N/A
Water 7732-18-5 100 0.1833 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 4.4083 N/A
Non-hazardous base ingredient(s) Not Available 100 4.4082 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.0911 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0911 N/A
Water 7732-18-5 100 0.0911 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0826 N/A
Methanol 67-56-1 100 0.0826 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0826 N/A
Water 7732-18-5 100 0.0826 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-30 2014-04-07 Groundwater - Non-saline less than or equal to 150m deep 2052
2014-03-30 2014-04-07 Groundwater - Non-saline less than or equal to 150m deep 1553
2014-05-07 2014-05-08 Surface Water - Runoff 362

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5317 0.0 0.0 0.0
2015 8651 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8666 0.0 0.0 0.0
2018 8742 0.0 0.0 0.0
2019 8699 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-16 No Incident Encountered 0.00 0.00
2014-05-16 No Incident Encountered 0.00 0.00

For data sources see[9]

References