X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122301000

Well Details

Well ID: 0505122301000
Loading map...
Location: 00/01-23-050-12W5/0
Location Alias: 00/01-23-50-12 W5M
Location Alias 2: 00/01-23-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 23
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 1-23-50-12
Operator Name: Vermilion Energy Inc.
License Number: 0415344
License Date: 2009-12-08
License Status: Issued
Spud Date: 2009-12-18
Final Drill Date: 2010-01-11
Well Total Depth: 3219.00 m
Surface Hole Latitude: 53.338580
Surface Hole Longitude: -115.637279

For data sources see[1][2]

Well History

Date Event
2009-12-08 Obtained License
2009-12-22 Surface Casing Operation Performed
2009-12-30 Well Log Performed
2010-01-02 Direction Drilling Operation Performed - Horizontal
2010-01-04 Intermediate Casing Operation Performed
2010-01-11 Finished Drilling
2010-01-11 Well Log Performed
2010-01-11 Well Mode changed to Drilled and Cased
2010-01-12 Well Log Performed
2010-01-13 Liner Casing Operation Performed
2010-01-15 Rig Released
2010-01-24 Perforation Treatment Performed - Open-Hole Completion
2010-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-15 Well Began Production
2010-04-15 Well Fluid changed to Crude Oil
2010-04-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-02 1475.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-24 Open Hole/Barefoot Completion 3207.00 3219.00 0
2010-02-25 Multi-Stage Fracture 2630.50 2630.60 0
2010-02-27 Multi-Stage Fracture 2554.90 2555.00 0
2010-02-27 Multi-Stage Fracture 2492.60 2492.70 0
2010-02-27 Multi-Stage Fracture 2417.50 2417.60 0
2010-02-27 Multi-Stage Fracture 2355.60 2355.70 0
2010-02-27 Multi-Stage Fracture 2280.00 2280.10 0
2010-02-27 Multi-Stage Fracture 2218.70 2218.80 0
2010-02-27 Multi-Stage Fracture 2145.30 2145.40 0
2010-02-27 Multi-Stage Fracture 2084.10 2084.20 0
2010-02-27 Multi-Stage Fracture 2011.80 2011.90 0
2010-02-25 Multi-Stage Fracture 3184.00 3184.10 0
2010-02-25 Multi-Stage Fracture 3117.70 3117.80 0
2010-02-25 Multi-Stage Fracture 3042.20 3042.30 0
2010-02-25 Multi-Stage Fracture 2981.50 2981.60 0
2010-02-25 Multi-Stage Fracture 2907.80 2907.90 0
2010-02-25 Multi-Stage Fracture 2831.50 2831.60 0
2010-02-25 Multi-Stage Fracture 2768.90 2769.00 0
2010-02-25 Multi-Stage Fracture 2706.50 2706.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5513 0.0 0.0 0.0
2011 8277 0.0 0.0 0.0
2012 7663 0.0 0.0 0.0
2013 8317 0.0 0.0 0.0
2014 8394 0.0 0.0 0.0
2015 7520 0.0 0.0 0.0
2016 8394 0.0 0.0 0.0
2017 8727 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8731 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References