If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505122809020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.349617,"lon":-115.712162,"icon":""}]} |
Location: 02/09-28-050-12W5/0 | |
Location Alias: 02/09-28-50-12 W5M | |
Location Alias 2: 02/09-28-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 9-28-50-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0433262 | |
License Date: 2011-05-02 | |
License Status: Issued | |
Spud Date: 2011-06-29 | |
Final Drill Date: 2011-07-08 | |
Well Total Depth: 3501.00 m | |
Surface Hole Latitude: 53.349617 | |
Surface Hole Longitude: -115.712162 |
Date | Event |
---|---|
2011-05-02 | Obtained License |
2011-06-08 | Well Log Performed |
2011-07-01 | Surface Casing Operation Performed |
2011-07-01 | Well Log Performed |
2011-07-02 | Direction Drilling Operation Performed - Horizontal |
2011-07-04 | Well Log Performed |
2011-07-08 | Finished Drilling |
2011-07-08 | Well Mode changed to Drilled and Cased |
2011-07-10 | Perforation Treatment Performed - Open-Hole Completion |
2011-07-10 | Production Casing Operation Performed |
2011-07-10 | Rig Released |
2011-07-26 | Well Log Performed |
2011-08-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-13 | Well Began Production |
2011-08-13 | Well Fluid changed to Crude Oil |
2011-08-13 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-02 | 1368.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-07-10 | Open Hole/Barefoot Completion | 3497.00 | 3501.00 | 0 |
2011-08-11 | Multi-Stage Fracture | 2915.40 | 2915.50 | 0 |
2011-08-11 | Multi-Stage Fracture | 2855.10 | 2855.20 | 0 |
2011-08-12 | Multi-Stage Fracture | 2781.00 | 2781.10 | 0 |
2011-08-12 | Multi-Stage Fracture | 2719.70 | 2719.80 | 0 |
2011-08-12 | Multi-Stage Fracture | 2658.80 | 2658.90 | 0 |
2011-08-12 | Multi-Stage Fracture | 2597.60 | 2597.70 | 0 |
2011-08-12 | Multi-Stage Fracture | 2536.80 | 2536.90 | 0 |
2011-08-12 | Multi-Stage Fracture | 2476.30 | 2476.40 | 0 |
2011-08-12 | Multi-Stage Fracture | 2415.10 | 2415.20 | 0 |
2011-08-12 | Multi-Stage Fracture | 2353.90 | 2354.00 | 0 |
2011-08-11 | Multi-Stage Fracture | 3486.50 | 3486.60 | 0 |
2011-08-12 | Multi-Stage Fracture | 2292.80 | 2292.90 | 0 |
2011-08-12 | Multi-Stage Fracture | 2204.70 | 2204.80 | 0 |
2011-08-12 | Multi-Stage Fracture | 2158.00 | 2158.10 | 0 |
2011-08-11 | Multi-Stage Fracture | 3389.20 | 3389.30 | 0 |
2011-08-11 | Multi-Stage Fracture | 3328.20 | 3328.30 | 0 |
2011-08-11 | Multi-Stage Fracture | 3252.20 | 3252.30 | 0 |
2011-08-11 | Multi-Stage Fracture | 3190.20 | 3190.30 | 0 |
2011-08-11 | Multi-Stage Fracture | 3128.50 | 3128.60 | 0 |
2011-08-11 | Multi-Stage Fracture | 3052.80 | 3052.90 | 0 |
2011-08-11 | Multi-Stage Fracture | 2991.60 | 2991.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2300 | 0.0 | 0.0 | 0.0 |
2012 | 8593 | 0.0 | 0.0 | 0.0 |
2013 | 8425 | 0.0 | 0.0 | 0.0 |
2014 | 8525 | 0.0 | 0.0 | 0.0 |
2015 | 8663 | 0.0 | 0.0 | 0.0 |
2016 | 8723 | 0.0 | 0.0 | 0.0 |
2017 | 8745 | 0.0 | 0.0 | 0.0 |
2018 | 8419 | 0.0 | 0.0 | 0.0 |
2019 | 8354 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[6]