If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505131314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.307263,"lon":-115.775048,"icon":""}]} |
| Location: 00/14-13-050-13W5/0 | |
| Location Alias: 00/14-13-50-13 W5M | |
| Location Alias 2: 00/14-13-050-13 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 13 | |
| Section: 13 | |
| County/Municipality: Yellowhead County | |
| Well Name: RIDGEBACK PEMBINA 14-13-50-13 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0436285 | |
| License Date: 2011-08-24 | |
| License Status: Issued | |
| Spud Date: 2011-10-03 | |
| Final Drill Date: 2011-10-14 | |
| Well Total Depth: 3444.00 m | |
| Surface Hole Latitude: 53.307263 | |
| Surface Hole Longitude: -115.775048 |
| Date | Event |
|---|---|
| 2011-08-24 | Obtained License |
| 2011-10-05 | Surface Casing Operation Performed |
| 2011-10-05 | Well Log Performed |
| 2011-10-06 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-08 | Well Log Performed |
| 2011-10-14 | Finished Drilling |
| 2011-10-14 | Well Log Performed |
| 2011-10-14 | Well Mode changed to Drilled and Cased |
| 2011-10-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-10-16 | Production Casing Operation Performed |
| 2011-10-17 | Rig Released |
| 2011-10-26 | Well Log Performed |
| 2011-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-11 | Well Began Production |
| 2011-11-11 | Well Fluid changed to Crude Oil |
| 2011-11-11 | Well Mode changed to Flowing |
| 2017-04-01 | Well Fluid changed to Crude Oil |
| 2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-06 | 1463.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-16 | Open Hole/Barefoot Completion | 3439.00 | 3444.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2868.60 | 2868.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2797.60 | 2797.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2740.80 | 2740.90 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2668.90 | 2669.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2597.50 | 2597.60 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2527.20 | 2527.30 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2467.00 | 2467.10 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2394.80 | 2394.90 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2336.60 | 2336.70 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2262.30 | 2262.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3414.20 | 3414.30 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2189.30 | 2189.40 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2130.60 | 2130.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3350.10 | 3350.20 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3278.20 | 3278.30 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3204.90 | 3205.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3143.90 | 3144.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3070.60 | 3070.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3011.10 | 3011.20 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2937.20 | 2937.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 510 | 0.0 | 0.0 | 0.0 |
| 2012 | 8284 | 0.0 | 0.0 | 0.0 |
| 2013 | 8708 | 0.0 | 0.0 | 0.0 |
| 2014 | 8543 | 0.0 | 0.0 | 0.0 |
| 2015 | 8627 | 0.0 | 0.0 | 0.0 |
| 2016 | 8534 | 0.0 | 0.0 | 0.0 |
| 2017 | 8552 | 0.0 | 0.0 | 0.0 |
| 2018 | 8679 | 0.0 | 0.0 | 0.0 |
| 2019 | 8540 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]