X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514250715002

Well Details

Well ID: 0514250715002
Loading map...
Location: 00/15-07-051-25W4/2
Location Alias: 00/15-07-51-25 W4M
Location Alias 2: 00/15-07-051-25 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 25
Section: 07
County/Municipality: Parkland County
Well Name: OUTPOST LEDUC-WB 15-7-51-25
Operator Name: Outpost Energy Ltd.
License Number: B0002464
License Date: 1948-11-08
License Status: Suspension
Spud Date: 1948-11-12
Final Drill Date: 1948-12-03
Well Total Depth: 1281.10 m
Surface Hole Latitude: 53.394046
Surface Hole Longitude: -113.673101

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-11-08 Obtained License
1948-11-26 Drill Stem Test Performed
1948-11-30 Drill Stem Test Performed
1948-12-03 Finished Drilling
1948-12-03 Well Mode changed to Drilled and Cased
1948-12-05 Production Casing Operation Performed
1948-12-08 Perforation Treatment Performed - Bullet Perforation
1948-12-09 Drill Stem Test Performed
1948-12-09 Perforation Treatment Performed - Bullet Perforation
1948-12-11 Perforation Treatment Performed - Cement Squeeze
1948-12-14 Drill Stem Test Performed
1948-12-15 Perforation Treatment Performed - Cement Squeeze
1948-12-19 Perforation Treatment Performed - Bullet Perforation
1948-12-20 Perforation Treatment Performed - Cement Squeeze
1948-12-24 Perforation Treatment Performed - Open-Hole Completion
2000-11-24 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-11-24 Perforation Treatment Performed - Jet Perforation
2000-11-24 Well Began Production
2000-11-24 Well Fluid changed to Gas
2000-11-24 Well Mode changed to Flowing
2013-02-01 Well Fluid changed to Gas
2013-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-12-08 Bullet Perforation 1136.90 1136.90 13
2000-11-24 Perforation 1258.20 1260.20 17
1948-12-09 Bullet Perforation 1140.60 1141.20 26
1948-12-11 Cement Squeeze 1136.90 1141.20 0
1948-12-15 Cement Squeeze 1136.90 1141.20 0
1948-12-19 Bullet Perforation 1266.40 1266.70 23
1948-12-20 Cement Squeeze 1266.40 1266.70 0
1948-12-24 Open Hole/Barefoot Completion 1276.20 1281.10 0
2000-11-24 Bridge Plug, No Cement 1264.50 1265.00 0
2000-11-24 Bridge Plug, No Cement 1261.50 1262.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 921 0.0 0.0 0.0
2001 542 0.0 0.0 0.0
2005 2667 0.0 0.0 0.0
2006 4696 0.0 0.0 0.0
2007 6277 0.0 0.0 0.0
2008 7621 0.0 0.0 0.0
2009 6747 0.0 0.0 0.0
2010 7786 0.0 0.0 0.0
2011 5986 0.0 0.0 0.0

For data sources see[5]

References