X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260303020

Well Details

Well ID: 0514260303020
Loading map...
Location: 02/03-03-051-26W4/0
Location Alias: 02/03-03-51-26 W4M
Location Alias 2: 02/03-03-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 03
County/Municipality: Parkland County
Well Name: HOME-ANGLO WOODBEND NO. 18-2
Operator Name: Imperial Oil Resources Limited
License Number: 0003878
License Date: 1951-12-01
License Status: Abandoned
Spud Date: 1951-12-06
Final Drill Date: 1952-01-12
Well Total Depth: 1518.50 m
Surface Hole Latitude: 53.369179
Surface Hole Longitude: -113.755855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-01 Obtained License
1951-12-06 Direction Drilling Operation Performed - 98
1952-01-07 Drill Stem Test Performed
1952-01-09 Drill Stem Test Performed
1952-01-10 Drill Stem Test Performed
1952-01-12 Finished Drilling
1952-01-12 Well Mode changed to Drilled and Cased
1952-01-13 Production Casing Operation Performed
1952-01-17 Perforation Treatment Performed - Bullet Perforation
1952-01-18 Perforation Treatment Performed - Acid Wash - No Pressure
1952-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
1952-01-20 Perforation Treatment Performed - Acid Wash - No Pressure
1952-01-21 Perforation Treatment Performed - Jet Perforation
1952-01-26 Well Began Production
1952-01-26 Well Fluid changed to Crude Oil
1952-01-26 Well Mode changed to Flowing
1956-02-13 Well Fluid changed to Crude Oil
1956-02-13 Well Mode changed to Pumping
1980-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-12 Well Fluid changed to Crude Oil
1983-04-12 Well Mode changed to Suspended
1987-03-20 Well Fluid changed to Crude Oil
1987-03-20 Well Mode changed to Pumping
1993-02-26 Well Log Performed
1995-01-04 Well Fluid changed to Crude Oil
1995-01-04 Well Mode changed to Suspended
1995-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-29 Plug Back Performed
1995-08-18 Perforation Treatment Performed - Jet Perforation
1995-08-18 Perforation Treatment Performed - Remedial Casing
1995-08-18 Well Fluid changed to Crude Oil
1995-08-18 Well Mode changed to Abandoned
1995-08-23 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1951-12-06 1036.30 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-17 Bullet Perforation 1488.00 1493.20 13
1995-08-18 Perforation 195.00 195.30 13
1995-08-18 Remedial Casing Cementing 195.00 195.30 0
1952-01-18 Acid Wash 1488.00 1493.20 0
1952-01-19 Acid Wash 1488.00 1493.20 0
1952-01-20 Acid Wash 1488.00 1493.20 0
1952-01-21 Perforation 1478.60 1480.40 20
1952-01-21 Perforation 1482.50 1484.40 20
1980-03-10 Acid Treatment 1478.60 1493.20 0
1995-07-29 Packing Device Capped w/Cement 1456.00 1464.00 0
1995-07-29 Packing Device Capped w/Cement 1142.00 1150.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8249 0.0 0.0 0.0
1968 8543 0.0 0.0 0.0
1969 8747 0.0 0.0 0.0
1970 8523 0.0 0.0 0.0
1971 7320 0.0 0.0 0.0
1972 7710 0.0 0.0 0.0
1973 8651 0.0 0.0 0.0
1974 8269 0.0 0.0 0.0
1975 8553 0.0 0.0 0.0
1976 8391 0.0 0.0 0.0
1977 8137 0.0 0.0 0.0
1978 7659 0.0 0.0 0.0
1979 8535 0.0 0.0 0.0
1980 6272 0.0 0.0 0.0
1981 5138 0.0 0.0 0.0
1987 5617 0.0 0.0 0.0
1988 8250 0.0 0.0 0.0
1989 8192 0.0 0.0 0.0
1990 8149 0.0 0.0 0.0
1991 8340 0.0 0.0 0.0
1992 8018 0.0 0.0 0.0
1993 7818 0.0 0.0 0.0
1994 8106 0.0 0.0 0.0
1995 74 0.0 0.0 0.0

For data sources see[6]

References