X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260315000

Well Details

Well ID: 0514260315000
Loading map...
Location: 00/15-03-051-26W4/0
Location Alias: 00/15-03-51-26 W4M
Location Alias 2: 00/15-03-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 03
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 15-3-51-26
Operator Name: NEP Canada ULC
License Number: 0085839
License Date: 1980-09-24
License Status: Suspension
Spud Date: 1980-11-15
Final Drill Date: 1980-12-06
Well Total Depth: 1637.00 m
Surface Hole Latitude: 53.380261
Surface Hole Longitude: -113.747835

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-24 Obtained License
1980-11-29 Well Log Performed
1980-12-03 Lost Circulation Occurred
1980-12-06 Finished Drilling
1980-12-06 Well Log Performed
1980-12-06 Well Mode changed to Drilled and Cased
1980-12-07 Liner Casing Operation Performed
1980-12-30 Perforation Treatment Performed - Jet Perforation
1980-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-04 Well Began Production
1981-01-04 Well Fluid changed to Crude Oil
1981-01-04 Well Mode changed to Pumping
1981-01-08 Perforation Treatment Performed - Jet Perforation
1981-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-17 Perforation Treatment Performed - Cement Squeeze
1982-07-28 Perforation Treatment Performed - Cement Squeeze
1982-07-29 Perforation Treatment Performed - Jet Perforation
1982-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-19 Perforation Treatment Performed - Cement Squeeze
1982-08-24 Perforation Treatment Performed - Jet Perforation
1982-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-24 Well Fluid changed to Crude Oil
1990-05-24 Well Mode changed to Suspended
1992-09-28 Well Log Performed
1992-11-12 Well Log Performed
1992-12-11 Well Log Performed
1992-12-12 Perforation Treatment Performed - Cement Squeeze
1992-12-13 Perforation Treatment Performed - Jet Perforation
1992-12-13 Well Log Performed
1992-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-18 Well Fluid changed to Crude Oil
1992-12-18 Well Mode changed to Pumping
1993-03-25 Well Fluid changed to Crude Oil
1993-03-25 Well Mode changed to Suspended
1996-07-09 Perforation Treatment Performed - Jet Perforation
1996-07-09 Well Log Performed
1996-08-01 Well Fluid changed to Crude Oil
1996-08-01 Well Mode changed to Pumping
1998-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-11 Perforation Treatment Performed - Jet Perforation
1998-06-11 Plug Back Performed
1998-06-11 Well Log Performed
1998-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-16 Perforation Treatment Performed - Jet Perforation
1998-06-16 Plug Back Performed
1998-06-16 Well Log Performed
1998-06-20 Well Fluid changed to Crude Oil
1998-06-20 Well Mode changed to Pumping
1999-01-31 Well Fluid changed to Crude Oil
1999-01-31 Well Mode changed to Suspended
1999-12-31 Well Fluid changed to Crude Oil
1999-12-31 Well Mode changed to Suspended
2001-03-11 Perforation Treatment Performed - Fractured
2003-11-07 Perforation Treatment Performed - Jet Perforation
2003-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-10 Plug Back Performed
2003-11-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-30 Perforation 1611.00 1614.00 7
1982-08-19 Cement Squeeze 1611.70 1612.30 0
1982-08-24 Perforation 1611.00 1612.00 13
1982-08-25 Acid Treatment 1611.00 1612.00 0
1992-12-12 Cement Squeeze 1611.00 1612.00 0
1992-12-13 Perforation 1608.00 1608.50 13
1992-12-14 Acid Treatment 1608.00 1608.50 0
1996-07-09 Perforation 1601.00 1602.00 13
1998-06-11 Packing Device Capped w/Cement 1584.00 1592.00 0
1998-06-11 Perforation 1355.00 1360.00 13
1998-06-11 Perforation 1287.00 1288.00 18
1980-12-31 Acid Treatment 1611.00 1614.00 0
1998-06-12 Acid Treatment 1355.00 1360.00 0
1998-06-16 Packing Device Capped w/Cement 1337.00 1345.00 0
1998-06-16 Perforation 1284.00 1286.00 18
2001-03-11 Fracture 1284.00 1286.00 0
2001-03-11 Fracture 1287.00 1288.00 0
2003-11-07 Perforation 1278.00 1280.00 17
2003-11-10 Packing Device Capped w/Cement 1260.00 1268.00 0
1981-01-08 Perforation 1601.50 1604.50 7
1981-01-09 Acid Treatment 1601.50 1604.50 0
1981-01-17 Cement Squeeze 1601.50 1604.50 0
1982-07-28 Cement Squeeze 1611.00 1614.00 0
1982-07-29 Perforation 1611.70 1612.30 7
1982-07-30 Acid Treatment 1611.70 1612.30 0
1982-08-18 Acid Treatment 1611.70 1612.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 7731 0.0 0.0 0.0
1982 7923 0.0 0.0 0.0
1983 8523 0.0 0.0 0.0
1984 8544 0.0 0.0 0.0
1985 1200 0.0 0.0 0.0
1986 5506 0.0 0.0 0.0
1987 7241 0.0 0.0 0.0
1988 7905 0.0 0.0 0.0
1989 7818 0.0 0.0 0.0
1990 2977 0.0 0.0 0.0
1993 795 0.0 0.0 0.0
1996 3434 0.0 0.0 0.0
1997 8344 0.0 0.0 0.0
1998 4614 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-12-03 Lost Circulation 1602.00 1602.00

For data sources see[6]

References