If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514260903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.383085,"lon":-113.778865,"icon":""}]} |
Location: 00/03-09-051-26W4/0 | |
Location Alias: 00/03-09-51-26 W4M | |
Location Alias 2: 00/03-09-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Parkland County | |
Well Name: IMPERIAL WOODBEND NO. 21 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0000113 | |
License Date: 1949-06-21 | |
License Status: RecCertified | |
Spud Date: 1949-07-01 | |
Final Drill Date: 1949-07-29 | |
Well Total Depth: 1622.50 m | |
Surface Hole Latitude: 53.383085 | |
Surface Hole Longitude: -113.778865 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-06-21 | Obtained License |
1949-07-19 | Drill Stem Test Performed |
1949-07-20 | Drill Stem Test Performed |
1949-07-21 | Drill Stem Test Performed |
1949-07-23 | Drill Stem Test Performed |
1949-07-26 | Liner Casing Operation Performed |
1949-07-29 | Finished Drilling |
1949-07-29 | Well Mode changed to Drilled and Cased |
1949-07-31 | Perforation Treatment Performed - Bullet Perforation |
1949-08-02 | Perforation Treatment Performed - Bullet Perforation |
1949-08-03 | Well Began Production |
1949-08-03 | Well Fluid changed to Crude Oil |
1949-08-03 | Well Mode changed to Flowing |
1971-06-10 | Well Fluid changed to Crude Oil |
1971-06-10 | Well Mode changed to Pumping |
1979-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-05-27 | Perforation Treatment Performed - Cement Squeeze |
1979-05-29 | Perforation Treatment Performed - Jet Perforation |
1979-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-04-11 | Well Fluid changed to Crude Oil |
1983-04-11 | Well Mode changed to Suspended |
1985-05-22 | Well Log Performed |
1985-05-23 | Perforation Treatment Performed - Cement Squeeze |
1985-05-24 | Well Log Performed |
1985-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-05-27 | Perforation Treatment Performed - Jet Perforation |
1985-06-11 | Perforation Treatment Performed - Cement Plug |
1985-06-11 | Plug Back Performed |
1996-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-08-07 | Perforation Treatment Performed - Jet Perforation |
1996-08-07 | Plug Back Performed |
1996-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-06 | Perforation Treatment Performed - Remedial Casing |
1996-09-11 | Well Abandoned |
1996-09-11 | Well Fluid changed to Crude Oil |
1996-09-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-07-31 | Bullet Perforation | 1618.80 | 1620.30 | 20 |
1985-06-11 | Cement Plug | 1486.00 | 1617.60 | 0 |
1996-08-07 | Packing Device Capped w/Cement | 1232.00 | 1240.00 | 0 |
1996-08-07 | Perforation | 160.00 | 161.00 | 13 |
1996-09-06 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1996-09-06 | Packing Device Capped w/Cement | 35.60 | 170.00 | 0 |
1949-08-02 | Bullet Perforation | 1618.80 | 1620.30 | 20 |
1979-05-24 | Acid Treatment | 1618.80 | 1620.30 | 0 |
1979-05-27 | Cement Squeeze | 1618.80 | 1620.30 | 0 |
1979-05-29 | Perforation | 1618.20 | 1618.40 | 0 |
1979-05-30 | Acid Treatment | 1618.20 | 1618.40 | 0 |
1985-05-23 | Cement Squeeze | 1618.20 | 1618.40 | 0 |
1985-05-27 | Perforation | 1617.00 | 1617.50 | 13 |
1985-05-27 | Acid Treatment | 1617.00 | 1617.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 125 | 0.0 | 0.0 | 0.0 |
1971 | 4416 | 0.0 | 0.0 | 0.0 |
1972 | 8580 | 0.0 | 0.0 | 0.0 |
1973 | 8367 | 0.0 | 0.0 | 0.0 |
1974 | 8434 | 0.0 | 0.0 | 0.0 |
1975 | 7132 | 0.0 | 0.0 | 0.0 |
1976 | 7120 | 0.0 | 0.0 | 0.0 |
1977 | 7836 | 0.0 | 0.0 | 0.0 |
1978 | 6287 | 0.0 | 0.0 | 0.0 |
1979 | 5128 | 0.0 | 0.0 | 0.0 |
1980 | 8354 | 0.0 | 0.0 | 0.0 |
1981 | 3225 | 0.0 | 0.0 | 0.0 |
1982 | 1932 | 0.0 | 0.0 | 0.0 |
1983 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]