X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260903020

Well Details

Well ID: 0514260903020
Loading map...
Location: 02/03-09-051-26W4/0
Location Alias: 02/03-09-51-26 W4M
Location Alias 2: 02/03-09-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 103
Operator Name: Imperial Oil Resources Limited
License Number: 0006355
License Date: 1953-04-27
License Status: RecCertified
Spud Date: 1953-05-17
Final Drill Date: 1953-06-08
Well Total Depth: 1532.20 m
Surface Hole Latitude: 53.383152
Surface Hole Longitude: -113.778406

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-04-27 Obtained License
1953-05-29 Drill Stem Test Performed
1953-05-30 Drill Stem Test Performed
1953-06-08 Finished Drilling
1953-06-08 Production Casing Operation Performed
1953-06-08 Well Mode changed to Drilled and Cased
1953-06-24 Perforation Treatment Performed - Open-Hole Completion
1953-06-27 Well Began Production
1953-06-27 Well Fluid changed to Crude Oil
1953-06-27 Well Mode changed to Flowing
1960-03-21 Well Fluid changed to Crude Oil
1960-03-21 Well Mode changed to Pumping
1983-04-12 Well Fluid changed to Crude Oil
1983-04-12 Well Mode changed to Suspended
1996-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-12 Plug Back Performed
1996-08-12 Well Fluid changed to Crude Oil
1996-08-12 Well Mode changed to Abandoned Zone
1996-08-13 Perforation Treatment Performed - Jet Perforation
1996-09-06 Perforation Treatment Performed - Remedial Casing
1996-09-11 Well Abandoned
1996-09-11 Well Fluid changed to Crude Oil
1996-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-24 Open Hole/Barefoot Completion 1524.60 1532.20 0
1996-08-12 Packing Device Capped w/Cement 1433.20 1514.00 0
1996-08-13 Perforation 160.00 161.00 13
1996-09-06 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8227 0.0 0.0 0.0
1968 8317 0.0 0.0 0.0
1969 6407 0.0 0.0 0.0

For data sources see[5]

References