X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260905000

Well Details

Well ID: 0514260905000
Loading map...
Location: 00/05-09-051-26W4/0
Location Alias: 00/05-09-51-26 W4M
Location Alias 2: 00/05-09-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 39
Operator Name: Imperial Oil Resources Limited
License Number: 0002590
License Date: 1951-02-01
License Status: RecCertified
Spud Date: 1951-03-01
Final Drill Date: 1951-04-04
Well Total Depth: 1619.10 m
Surface Hole Latitude: 53.387000
Surface Hole Longitude: -113.785179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-02-01 Obtained License
1951-03-19 Drill Stem Test Performed
1951-03-25 Drill Stem Test Performed
1951-03-27 Drill Stem Test Performed
1951-03-28 Drill Stem Test Performed
1951-03-31 Liner Casing Operation Performed
1951-04-04 Finished Drilling
1951-04-04 Well Mode changed to Drilled and Cased
1951-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-04-08 Perforation Treatment Performed - Jet Perforation
1951-04-09 Well Began Production
1951-04-09 Well Fluid changed to Crude Oil
1951-04-09 Well Mode changed to Flowing
1965-06-14 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-01 Well Type changed to Observation
1980-06-07 Perforation Treatment Performed - Cement Squeeze
1980-06-11 Perforation Treatment Performed - Cement Squeeze
1980-06-16 Perforation Treatment Performed - Cement Squeeze
1980-06-19 Perforation Treatment Performed - Selective Jet Perforations
1980-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-01 Well Fluid changed to Crude Oil
1980-08-01 Well Mode changed to Flowing
1983-04-11 Well Fluid changed to Crude Oil
1983-04-11 Well Mode changed to Suspended
1991-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-18 Perforation Treatment Performed - Cement Squeeze
1991-06-18 Plug Back Performed
1991-06-19 Perforation Treatment Performed - Cement Squeeze
1991-06-19 Perforation Treatment Performed - Jet Perforation
1991-06-19 Plug Back Performed
1991-06-19 Well Abandoned
1991-06-19 Well Fluid changed to Crude Oil
1991-06-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-08 Perforation 1614.50 1616.00 13
1991-06-18 Cement Squeeze 1613.60 1613.80 0
1991-06-18 Packing Device Capped w/Cement 1535.00 1594.60 0
1991-06-19 Perforation 169.50 170.00 7
1991-06-19 Cement Squeeze 169.50 170.00 0
1951-04-08 Acid Treatment 1614.50 1616.00 0
1965-06-14 Hydra Jet Perforation 1603.20 1603.20 0
1965-08-27 Acid Treatment 1603.20 1603.20 0
1980-06-07 Cement Squeeze 1603.20 1603.20 0
1980-06-11 Cement Squeeze 1603.20 1603.20 0
1980-06-16 Cement Squeeze 1614.50 1616.00 0
1980-06-19 Selective Jet Perforations 1613.60 1613.80 0
1980-06-20 Acid Treatment 1613.60 1613.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1980 3411 0.0 0.0 0.0
1981 7737 0.0 0.0 0.0
1982 3816 0.0 0.0 0.0

For data sources see[5]

References