If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0514260906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.386975,"lon":-113.778394,"icon":""}]} |
| Location: 00/06-09-051-26W4/0 | |
| Location Alias: 00/06-09-51-26 W4M | |
| Location Alias 2: 00/06-09-051-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 09 | |
| County/Municipality: Parkland County | |
| Well Name: IMPERIAL WOODBEND NO. 57 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0002862 | |
| License Date: 1951-05-10 | |
| License Status: Abandoned | |
| Spud Date: 1951-05-21 | |
| Final Drill Date: 1951-06-15 | |
| Well Total Depth: 1619.40 m | |
| Surface Hole Latitude: 53.386975 | |
| Surface Hole Longitude: -113.778394 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-05-10 | Obtained License |
| 1951-05-31 | Drill Stem Test Performed |
| 1951-06-02 | Drill Stem Test Performed |
| 1951-06-03 | Drill Stem Test Performed |
| 1951-06-08 | Drill Stem Test Performed |
| 1951-06-10 | Drill Stem Test Performed |
| 1951-06-12 | Liner Casing Operation Performed |
| 1951-06-15 | Finished Drilling |
| 1951-06-15 | Well Mode changed to Drilled and Cased |
| 1951-06-18 | Perforation Treatment Performed - Jet Perforation |
| 1951-06-19 | Well Began Production |
| 1951-06-19 | Well Fluid changed to Crude Oil |
| 1951-06-19 | Well Mode changed to Flowing |
| 1963-05-30 | Perforation Treatment Performed - Cement Squeeze |
| 1963-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-05-31 | Perforation Treatment Performed - Jet Perforation |
| 1963-06-18 | Perforation Treatment Performed - Cement Squeeze |
| 1963-06-19 | Perforation Treatment Performed - Bullet Perforation |
| 1963-06-19 | Perforation Treatment Performed - Jet Perforation |
| 1963-06-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1963-07-13 | Well Fluid changed to Crude Oil |
| 1963-07-13 | Well Mode changed to Pumping |
| 1972-10-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1972-10-18 | Perforation Treatment Performed - Cement Squeeze |
| 1972-10-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1972-10-20 | Perforation Treatment Performed - Cement Squeeze |
| 1972-10-24 | Perforation Treatment Performed - Jet Perforation |
| 1972-10-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1983-04-11 | Well Fluid changed to Crude Oil |
| 1983-04-11 | Well Mode changed to Suspended |
| 1996-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-08-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-29 | Plug Back Performed |
| 1996-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-06 | Perforation Treatment Performed - Remedial Casing |
| 1996-09-12 | Well Abandoned |
| 1996-09-12 | Well Fluid changed to Crude Oil |
| 1996-09-12 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-06-18 | Perforation | 1617.60 | 1619.10 | 20 |
| 1972-10-18 | Cement Squeeze | 1592.60 | 1617.30 | 0 |
| 1972-10-19 | Acid Wash | 1592.60 | 1617.30 | 0 |
| 1972-10-20 | Cement Squeeze | 1592.60 | 1617.30 | 0 |
| 1972-10-24 | Perforation | 1616.00 | 1616.40 | 7 |
| 1972-10-25 | Acid Wash | 1616.00 | 1616.40 | 0 |
| 1996-08-29 | Packing Device Capped w/Cement | 1572.00 | 1580.00 | 0 |
| 1996-08-29 | Packing Device Capped w/Cement | 1222.00 | 1230.00 | 0 |
| 1996-08-29 | Perforation | 160.00 | 161.00 | 13 |
| 1996-09-06 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
| 1996-09-06 | Packing Device Capped w/Cement | 50.60 | 165.00 | 0 |
| 1963-05-30 | Cement Squeeze | 1617.60 | 1619.10 | 0 |
| 1963-05-31 | Perforation | 1616.40 | 1616.70 | 13 |
| 1963-05-31 | Acid Treatment | 1616.40 | 1616.70 | 0 |
| 1963-06-18 | Cement Squeeze | 1616.40 | 1616.70 | 0 |
| 1963-06-19 | Bullet Perforation | 1592.60 | 1592.90 | 7 |
| 1963-06-19 | Perforation | 1617.00 | 1617.30 | 13 |
| 1963-06-25 | Hydra Jet Perforation | 1592.60 | 1592.60 | 0 |
| 1972-10-17 | Acid Wash | 1592.60 | 1617.30 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 120 | 0.0 | 0.0 | 0.0 |
| 1972 | 744 | 0.0 | 0.0 | 0.0 |
| 1973 | 8519 | 0.0 | 0.0 | 0.0 |
| 1974 | 8561 | 0.0 | 0.0 | 0.0 |
| 1975 | 8343 | 0.0 | 0.0 | 0.0 |
| 1976 | 8595 | 0.0 | 0.0 | 0.0 |
| 1977 | 8244 | 0.0 | 0.0 | 0.0 |
| 1978 | 8387 | 0.0 | 0.0 | 0.0 |
| 1979 | 7755 | 0.0 | 0.0 | 0.0 |
| 1980 | 5834 | 0.0 | 0.0 | 0.0 |
| 1981 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]