X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260907002

Well Details

Well ID: 0514260907002
Loading map...
Location: 00/07-09-051-26W4/2
Location Alias: 00/07-09-51-26 W4M
Location Alias 2: 00/07-09-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 09
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 7-9-51-26
Operator Name: NEP Canada ULC
License Number: 0002595
License Date: 1951-02-05
License Status: Suspension
Spud Date: 1951-03-13
Final Drill Date: 1951-04-14
Well Total Depth: 1619.10 m
Surface Hole Latitude: 53.387091
Surface Hole Longitude: -113.772775

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-02-05 Obtained License
1951-03-25 Drill Stem Test Performed
1951-03-30 Drill Stem Test Performed
1951-04-04 Drill Stem Test Performed
1951-04-05 Drill Stem Test Performed
1951-04-07 Drill Stem Test Performed
1951-04-08 Drill Stem Test Performed
1951-04-11 Liner Casing Operation Performed
1951-04-14 Finished Drilling
1951-04-14 Well Mode changed to Drilled and Cased
1951-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1951-04-17 Perforation Treatment Performed - Jet Perforation
1981-09-10 Perforation Treatment Performed - Cement Squeeze
1981-09-14 Perforation Treatment Performed - Selective Jet Perforations
1985-05-02 Perforation Treatment Performed - Cement Squeeze
1985-05-07 Perforation Treatment Performed - Jet Perforation
1985-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-09 Perforation Treatment Performed - Cement Squeeze
1985-06-05 Well Log Performed
1991-03-14 Well Log Performed
1991-03-15 Well Log Performed
1991-03-19 Perforation Treatment Performed - Jet Perforation
1991-03-19 Well Log Performed
1991-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-23 Well Log Performed
1992-02-25 Well Log Performed
1992-05-22 Well Log Performed
1993-03-17 Well Log Performed
1993-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-16 Well Log Performed
1994-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-01-14 Well Log Performed
1999-05-01 Well Began Production
1999-05-01 Well Fluid changed to Gas
1999-05-01 Well Mode changed to Flowing
1999-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-15 Plug Back Performed
1999-05-15 Well Log Performed
1999-05-16 Perforation Treatment Performed - Jet Perforation
1999-05-16 Well Fluid changed to Gas
1999-05-16 Well Log Performed
1999-05-16 Well Mode changed to Flowing
2000-10-14 Perforation Treatment Performed - Jet Perforation
2000-10-20 Perforation Treatment Performed - Cement Squeeze
2001-09-30 Well Fluid changed to Gas
2001-09-30 Well Mode changed to Suspended
2002-01-22 Perforation Treatment Performed - Fractured
2006-10-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2012-08-13 Well Log Performed
2012-11-05 Perforation Treatment Performed - Jet Perforation
2012-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-06 Plug Back Performed
2012-11-06 Well Log Performed
2012-11-13 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-17 Perforation 1615.40 1617.00 13
1991-03-19 Perforation 1589.00 1592.00 19
1991-03-19 Perforation 1596.00 1598.00 19
1991-03-20 Acid Treatment 1580.00 1598.00 0
1993-09-16 Packing Device Capped w/Cement 1593.10 1594.80 0
1994-01-14 Packing Device Capped w/Cement 1586.50 1587.50 0
1999-05-15 Packing Device Capped w/Cement 1517.00 1525.00 0
1999-05-16 Perforation 1338.00 1342.00 18
2000-10-14 Perforation 1286.20 1295.30 17
2000-10-20 Cement Squeeze 1286.20 1295.30 0
2002-01-22 Fracture 1338.00 1342.00 0
1951-04-17 Acid Wash 1615.40 1617.00 0
2006-10-13 Bridge Plug, No Cement 1329.00 1329.10 0
2012-11-05 Perforation 520.00 521.00 20
2012-11-06 Packing Device Capped w/Cement 1321.00 1329.00 0
2012-11-06 Packing Device Capped w/Cement 1267.00 1275.00 0
2012-11-13 Cement Squeeze 520.00 521.00 0
1981-09-10 Cement Squeeze 1615.40 1617.00 0
1981-09-14 Selective Jet Perforations 1615.00 1615.10 0
1985-05-02 Cement Squeeze 1615.00 1615.10 0
1985-05-07 Perforation 1613.70 1613.80 13
1985-05-08 Acid Treatment 1613.70 1613.80 0
1985-05-09 Cement Squeeze 1613.70 1613.80 0
1991-03-19 Perforation 1580.00 1583.00 19

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5404 0.0 0.0 0.0
2000 7664 0.0 0.0 0.0
2001 2014 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-01-22 No Incident Encountered 0.00 0.00
2012-11-05 No Incident Encountered 0.00 0.00
2012-11-12 No Incident Encountered 0.00 0.00
2012-11-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References