X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261011000

Well Details

Well ID: 0514261011000
Loading map...
Location: 00/11-10-051-26W4/0
Location Alias: 00/11-10-51-26 W4M
Location Alias 2: 00/11-10-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 10
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 81
Operator Name: Imperial Oil Resources Limited
License Number: 0003383
License Date: 1951-08-24
License Status: RecCertified
Spud Date: 1951-10-21
Final Drill Date: 1951-11-20
Well Total Depth: 1617.30 m
Surface Hole Latitude: 53.390429
Surface Hole Longitude: -113.753834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-24 Obtained License
1951-11-11 Drill Stem Test Performed
1951-11-12 Drill Stem Test Performed
1951-11-16 Liner Casing Operation Performed
1951-11-20 Finished Drilling
1951-11-20 Perforation Treatment Performed - Open-Hole Completion
1951-11-20 Well Mode changed to Drilled and Cased
1951-11-23 Well Began Production
1951-11-23 Well Fluid changed to Crude Oil
1951-11-23 Well Mode changed to Flowing
1965-11-18 Perforation Treatment Performed - Open-Hole Completion
1983-09-20 Well Log Performed
1983-09-27 Perforation Treatment Performed - Cement Squeeze
1983-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-03 Perforation Treatment Performed - Jet Perforation
1983-10-03 Well Log Performed
1983-10-04 Well Fluid changed to Crude Oil
1983-10-04 Well Mode changed to Pumping
1989-01-26 Well Fluid changed to Crude Oil
1989-01-26 Well Mode changed to Suspended
1992-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-10 Plug Back Performed
1992-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-11 Perforation Treatment Performed - Cement Plug
1992-06-11 Perforation Treatment Performed - Jet Perforation
1992-06-11 Perforation Treatment Performed - Remedial Casing
1992-06-11 Plug Back Performed
1992-06-11 Well Abandoned
1992-06-11 Well Fluid changed to Crude Oil
1992-06-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-20 Open Hole/Barefoot Completion 1592.60 1615.70 0
1992-06-11 Cement Plug 72.20 160.50 0
1965-11-18 Open Hole/Barefoot Completion 1592.60 1617.30 0
1983-09-27 Cement Squeeze 1592.60 1617.30 0
1983-10-03 Perforation 1611.60 1611.70 10
1983-10-03 Acid Treatment 1611.60 1611.70 0
1992-06-10 Packing Device Capped w/Cement 1588.00 1596.00 0
1992-06-11 Perforation 160.00 160.50 7
1992-06-11 Packing Device Capped w/Cement 1555.00 1560.00 0
1992-06-11 Remedial Casing Cementing 160.00 160.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 1337 0.0 0.0 0.0
1970 456 0.0 0.0 0.0
1971 1848 0.0 0.0 0.0
1972 872 0.0 0.0 0.0
1973 65 0.0 0.0 0.0
1975 24 0.0 0.0 0.0
1976 24 0.0 0.0 0.0
1983 1728 0.0 0.0 0.0
1984 7986 0.0 0.0 0.0
1985 8084 0.0 0.0 0.0
1986 8545 0.0 0.0 0.0
1987 8483 0.0 0.0 0.0
1988 7848 0.0 0.0 0.0

For data sources see[5]

References