X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261013000

Well Details

Well ID: 0514261013000
Loading map...
Location: 00/13-10-051-26W4/0
Location Alias: 00/13-10-51-26 W4M
Location Alias 2: 00/13-10-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 10
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 54
Operator Name: Imperial Oil Resources Limited
License Number: 0002844
License Date: 1951-05-04
License Status: RecCertified
Spud Date: 1951-05-20
Final Drill Date: 1951-06-14
Well Total Depth: 1619.10 m
Surface Hole Latitude: 53.394030
Surface Hole Longitude: -113.759859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-04 Obtained License
1951-05-29 Drill Stem Test Performed
1951-05-30 Drill Stem Test Performed
1951-06-02 Drill Stem Test Performed
1951-06-07 Drill Stem Test Performed
1951-06-09 Liner Casing Operation Performed
1951-06-14 Finished Drilling
1951-06-14 Well Mode changed to Drilled and Cased
1951-06-18 Perforation Treatment Performed - Acid Wash - No Pressure
1951-06-18 Perforation Treatment Performed - Jet Perforation
1951-06-19 Well Began Production
1951-06-19 Well Fluid changed to Crude Oil
1951-06-19 Well Mode changed to Flowing
1976-06-18 Well Fluid changed to Crude Oil
1976-06-18 Well Mode changed to Pumping
1986-01-28 Well Log Performed
1986-01-30 Perforation Treatment Performed - Cement Squeeze
1986-02-03 Perforation Treatment Performed - Jet Perforation
1986-02-06 Perforation Treatment Performed - Cement Squeeze
1986-02-10 Perforation Treatment Performed - Jet Perforation
1986-02-10 Well Log Performed
1986-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-23 Well Fluid changed to Crude Oil
1986-06-23 Well Mode changed to Suspended
1993-03-12 Well Log Performed
1993-08-17 Well Log Performed
1996-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-20 Perforation Treatment Performed - Jet Perforation
1996-03-20 Plug Back Performed
1996-03-20 Well Log Performed
1996-05-30 Well Abandoned
1996-05-30 Well Fluid changed to Crude Oil
1996-05-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-06-18 Perforation 1615.40 1617.00 13
1996-03-20 Perforation 160.00 161.00 13
1996-03-20 Packing Device Capped w/Cement 115.00 165.00 0
1951-06-18 Acid Wash 1615.40 1617.00 0
1986-01-30 Cement Squeeze 1615.40 1617.00 0
1986-02-03 Perforation 1614.70 1614.80 13
1986-02-06 Cement Squeeze 1614.70 1618.80 0
1986-02-10 Perforation 1614.00 1614.10 13
1986-02-12 Acid Treatment 1614.00 1614.10 0
1996-03-20 Packing Device Capped w/Cement 1556.00 1564.00 0
1996-03-20 Packing Device Capped w/Cement 1224.00 1232.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7043 0.0 0.0 0.0
1970 2670 0.0 0.0 0.0
1971 1136 0.0 0.0 0.0
1972 1272 0.0 0.0 0.0
1973 5128 0.0 0.0 0.0
1974 8571 0.0 0.0 0.0
1975 8522 0.0 0.0 0.0
1976 7655 0.0 0.0 0.0
1977 8284 0.0 0.0 0.0
1978 8375 0.0 0.0 0.0
1979 8439 0.0 0.0 0.0
1980 8290 0.0 0.0 0.0
1981 8515 0.0 0.0 0.0
1982 8551 0.0 0.0 0.0
1983 7983 0.0 0.0 0.0
1984 8451 0.0 0.0 0.0
1985 6692 0.0 0.0 0.0
1986 3542 0.0 0.0 0.0

For data sources see[5]

References