If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514261216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.393968,"lon":-113.692381,"icon":""}]} |
Location: 00/16-12-051-26W4/0 | |
Location Alias: 00/16-12-51-26 W4M | |
Location Alias 2: 00/16-12-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 12 | |
County/Municipality: Parkland County | |
Well Name: PAN OCEAN LEDUC 16-12-51-26 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: B0002621 | |
License Date: 1949-02-09 | |
License Status: RecExempt | |
Spud Date: 1949-02-27 | |
Final Drill Date: 1949-03-19 | |
Well Total Depth: 1300.00 m | |
Surface Hole Latitude: 53.393968 | |
Surface Hole Longitude: -113.692381 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-02-09 | Obtained License |
1949-03-16 | Drill Stem Test Performed |
1949-03-17 | Drill Stem Test Performed |
1949-03-18 | Drill Stem Test Performed |
1949-03-19 | Finished Drilling |
1949-03-19 | Production Casing Operation Performed |
1949-03-19 | Well Mode changed to Drilled and Cased |
1949-03-30 | Perforation Treatment Performed - Bullet Perforation |
1949-04-05 | Drill Stem Test Performed |
1949-04-05 | Perforation Treatment Performed - Cement Squeeze |
1949-04-08 | Perforation Treatment Performed - Bullet Perforation |
1949-04-09 | Perforation Treatment Performed - Cement Squeeze |
1949-04-11 | Perforation Treatment Performed - Bullet Perforation |
1949-04-21 | Well Began Production |
1949-04-21 | Well Fluid changed to Crude Oil |
1949-04-21 | Well Mode changed to Pumping |
1952-01-08 | Perforation Treatment Performed - Cement Squeeze |
1952-01-08 | Well Fluid changed to Crude Oil |
1952-01-08 | Well Mode changed to Suspended |
1953-08-02 | Well Fluid changed to Crude Oil |
1953-08-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-03-30 | Bullet Perforation | 1286.30 | 1286.90 | 0 |
1949-04-05 | Cement Squeeze | 1286.30 | 1286.90 | 0 |
1949-04-08 | Bullet Perforation | 1287.20 | 1287.80 | 33 |
1949-04-09 | Cement Squeeze | 1287.20 | 1287.80 | 0 |
1949-04-11 | Bullet Perforation | 1286.90 | 1287.20 | 23 |
1952-01-08 | Cement Squeeze | 1286.90 | 1287.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]