If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514261301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.397272,"lon":-113.691546,"icon":""}]} |
Location: 00/01-13-051-26W4/0 | |
Location Alias: 00/01-13-51-26 W4M | |
Location Alias 2: 00/01-13-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 13 | |
County/Municipality: Parkland County | |
Well Name: HUSKY-GLASGOW-WOODBEND NO. 1 | |
Operator Name: Husky Oil Operations Limited | |
License Number: B0002637 | |
License Date: 1949-02-14 | |
License Status: RecExempt | |
Spud Date: 1949-03-03 | |
Final Drill Date: 1949-05-07 | |
Well Total Depth: 1304.80 m | |
Surface Hole Latitude: 53.397272 | |
Surface Hole Longitude: -113.691546 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-02-14 | Obtained License |
1949-03-03 | Direction Drilling Operation Performed - 98 |
1949-04-30 | Drill Stem Test Performed |
1949-05-01 | Drill Stem Test Performed |
1949-05-02 | Drill Stem Test Performed |
1949-05-06 | Drill Stem Test Performed |
1949-05-07 | Finished Drilling |
1949-05-07 | Well Mode changed to Drilled and Cased |
1949-05-08 | Production Casing Operation Performed |
1949-05-12 | Perforation Treatment Performed - Bullet Perforation |
1949-05-14 | Well Began Production |
1949-05-14 | Well Fluid changed to Crude Oil |
1949-05-14 | Well Mode changed to Flowing |
1949-06-16 | Perforation Treatment Performed - Cement Squeeze |
1949-06-19 | Perforation Treatment Performed - Bullet Perforation |
1949-06-20 | Perforation Treatment Performed - Cement Squeeze |
1949-06-21 | Perforation Treatment Performed - Bullet Perforation |
1949-06-21 | Perforation Treatment Performed - Selective Bullet Perforations |
1949-06-28 | Perforation Treatment Performed - Cement Squeeze |
1949-07-06 | Perforation Treatment Performed - Bullet Perforation |
1949-07-12 | Well Fluid changed to Crude Oil |
1949-07-12 | Well Mode changed to Pumping |
1949-09-26 | Perforation Treatment Performed - Selective Bullet Perforations |
1949-10-21 | Perforation Treatment Performed - Cement Squeeze |
1949-10-27 | Perforation Treatment Performed - Jet Perforation |
1949-10-31 | Perforation Treatment Performed - Jet Perforation |
1954-08-03 | Well Fluid changed to Crude Oil |
1954-08-03 | Well Mode changed to Suspended |
1957-06-15 | Perforation Treatment Performed - Cement Plug |
1957-06-16 | Well Fluid changed to Crude Oil |
1957-06-16 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1949-03-03 | 945.80 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-05-12 | Bullet Perforation | 1296.00 | 1296.60 | 13 |
1949-10-21 | Cement Squeeze | 1295.10 | 1297.50 | 0 |
1949-10-27 | Perforation | 1296.00 | 1296.60 | 16 |
1949-10-31 | Perforation | 1296.00 | 1297.20 | 13 |
1957-06-15 | Cement Plug | 1264.90 | 1298.40 | 0 |
1949-06-16 | Cement Squeeze | 1296.00 | 1296.60 | 0 |
1949-06-19 | Bullet Perforation | 1296.00 | 1296.90 | 16 |
1949-06-20 | Cement Squeeze | 1296.00 | 1296.90 | 0 |
1949-06-21 | Bullet Perforation | 1295.10 | 1296.00 | 16 |
1949-06-21 | Selective Bullet Perforations | 1298.40 | 1298.40 | 0 |
1949-06-28 | Cement Squeeze | 1298.40 | 1298.40 | 0 |
1949-07-06 | Bullet Perforation | 1297.20 | 1297.80 | 16 |
1949-09-26 | Selective Bullet Perforations | 1265.80 | 1265.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]