X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261601022

Well Details

Well ID: 0514261601022
Loading map...
Location: 02/01-16-051-26W4/2
Location Alias: 02/01-16-51-26 W4M
Location Alias 2: 02/01-16-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: NEP 102 HZ LEDUC-WB 1-16-51-26
Operator Name: NEP Canada ULC
License Number: 0473837
License Date: 2014-12-22
License Status: Amended
Spud Date: 2015-01-02
Final Drill Date: 2015-01-11
Well Total Depth: 2564.00 m
Surface Hole Latitude: 53.408464
Surface Hole Longitude: -113.765733

For data sources see[1][2]

Well History

Date Event
2014-12-22 Obtained License
2015-01-04 Surface Casing Operation Performed
2015-01-05 Direction Drilling Operation Performed - Deviate
2015-01-06 Direction Drilling Operation Performed - Horizontal
2015-01-06 Well Log Performed
2015-01-08 Intermediate Casing Operation Performed
2015-01-11 Finished Drilling
2015-01-11 Well Log Performed
2015-01-11 Well Mode changed to Drilled and Cased
2015-01-12 Liner Casing Operation Performed
2015-01-13 Rig Released
2015-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-02 Well Log Performed
2015-02-20 Well Log Performed
2016-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-09 Plug Back Performed
2016-03-10 Perforation Treatment Performed - Jet Perforation
2016-03-10 Well Log Performed
2016-03-19 Well Began Production
2016-03-19 Well Fluid changed to Crude Oil
2016-03-19 Well Mode changed to Pumping
2017-08-01 Well Fluid changed to Crude Oil
2017-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-01-05 1110.10 Deviate (5 - 79 degrees)
2015-01-06 1485.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-24 Multi-Stage Fracture 2472.60 2472.80 0
2015-01-25 Multi-Stage Fracture 1547.40 1547.70 0
2016-03-09 Packing Device Capped w/Cement 1379.60 1431.00 0
2016-03-10 Perforation 1338.00 1343.00 17
2015-01-24 Multi-Stage Fracture 2372.70 2373.00 0
2015-01-24 Multi-Stage Fracture 2272.80 2273.10 0
2015-01-24 Multi-Stage Fracture 2173.20 2173.50 0
2015-01-25 Multi-Stage Fracture 2073.40 2073.70 0
2015-01-25 Multi-Stage Fracture 1960.00 1960.30 0
2015-01-25 Multi-Stage Fracture 1860.20 1860.50 0
2015-01-25 Multi-Stage Fracture 1760.50 1760.80 0
2015-01-25 Multi-Stage Fracture 1647.20 1647.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 158 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-13 No Incident Encountered 0.00 0.00
2015-02-24 No Incident Encountered 0.00 0.00
2015-05-12 No Incident Encountered 0.00 0.00
2016-03-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References