If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514261602022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.397804,"lon":-113.771968,"icon":""}]} |
Location: 02/02-16-051-26W4/2 | |
Location Alias: 02/02-16-51-26 W4M | |
Location Alias 2: 02/02-16-051-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 16 | |
County/Municipality: Parkland County | |
Well Name: MEC LEDUC-WB 2-16-51-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0213827 | |
License Date: 1998-02-24 | |
License Status: Abandoned | |
Spud Date: 1998-03-25 | |
Final Drill Date: 1998-03-31 | |
Well Total Depth: 1397.50 m | |
Surface Hole Latitude: 53.397804 | |
Surface Hole Longitude: -113.771968 |
Date | Event |
---|---|
1998-02-24 | Obtained License |
1998-03-31 | Finished Drilling |
1998-04-02 | Perforation Treatment Performed - Jet Perforation |
1998-04-02 | Well Log Performed |
1998-04-03 | Rig Released |
1998-04-03 | Well Mode changed to Drilled and Cased |
1999-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-17 | Perforation Treatment Performed - Jet Perforation |
1999-06-17 | Well Log Performed |
2000-09-19 | Perforation Treatment Performed - Fractured |
2000-10-06 | Well Began Production |
2000-10-06 | Well Fluid changed to Crude Oil |
2000-10-06 | Well Mode changed to Pumping |
2007-12-01 | Well Fluid changed to Crude Oil |
2007-12-01 | Well Mode changed to Suspended |
2014-09-08 | Well Log Performed |
2019-08-18 | Well Log Performed |
2019-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-08-19 | Perforation Treatment Performed - Jet Perforation |
2019-08-19 | Plug Back Performed |
2019-08-19 | Well Fluid changed to Crude Oil |
2019-08-19 | Well Log Performed |
2019-08-19 | Well Mode changed to Abandoned Zone |
2019-08-20 | Perforation Treatment Performed - Jet Perforation |
2019-08-20 | Well Log Performed |
2019-08-21 | Perforation Treatment Performed - Cement Squeeze |
2019-08-21 | Plug Back Performed |
2019-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-08-28 | Perforation Treatment Performed - Jet Perforation |
2019-08-28 | Plug Back Performed |
2019-08-28 | Well Log Performed |
2019-09-04 | Perforation Treatment Performed - Cement Squeeze |
2019-09-04 | Plug Back Performed |
2019-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-08 | Plug Back Performed |
2019-10-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-04-02 | Perforation | 1349.50 | 1354.50 | 13 |
2019-08-28 | Perforation | 198.00 | 199.00 | 13 |
2019-09-04 | Cement Squeeze | 198.00 | 199.00 | 0 |
2019-10-08 | Packing Device Capped w/Cement | 187.00 | 195.00 | 0 |
1999-06-16 | Packing Device Capped w/Cement | 1352.00 | 1360.00 | 0 |
1999-06-17 | Perforation | 1333.00 | 1338.00 | 13 |
2000-09-19 | Fracture | 1333.00 | 1338.00 | 0 |
2019-08-19 | Packing Device Capped w/Cement | 1317.00 | 1325.00 | 0 |
2019-08-19 | Perforation | 605.00 | 606.00 | 13 |
2019-08-20 | Perforation | 270.00 | 271.00 | 13 |
2019-08-21 | Cement Squeeze | 270.00 | 606.00 | 0 |
2019-08-28 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1794 | 0.0 | 0.0 | 0.0 |
2001 | 3467 | 0.0 | 0.0 | 0.0 |
2002 | 552 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-09-10 | No Incident Encountered | 0.00 | 0.00 |
2019-10-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]