X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261603002

Well Details

Well ID: 0514261603002
Loading map...
Location: 00/03-16-051-26W4/2
Location Alias: 00/03-16-51-26 W4M
Location Alias 2: 00/03-16-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 3-16-51-26
Operator Name: NEP Canada ULC
License Number: B0002373
License Date: 1948-09-28
License Status: Abandoned
Spud Date: 1948-10-12
Final Drill Date: 1948-12-07
Well Total Depth: 1619.10 m
Surface Hole Latitude: 53.397920
Surface Hole Longitude: -113.777435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-09-28 Obtained License
1948-11-01 Drill Stem Test Performed
1948-11-03 Drill Stem Test Performed
1948-11-04 Drill Stem Test Performed
1948-11-14 Drill Stem Test Performed
1948-11-27 Drill Stem Test Performed
1948-12-07 Finished Drilling
1948-12-07 Well Mode changed to Drilled and Cased
1948-12-15 Production Casing Operation Performed
1948-12-21 Perforation Treatment Performed - Bullet Perforation
1973-09-11 Perforation Treatment Performed - Cement Squeeze
1973-09-13 Perforation Treatment Performed - Jet Perforation
1973-09-14 Perforation Treatment Performed - Acid Wash - No Pressure
1982-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-01 Perforation Treatment Performed - Cement Squeeze
1982-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-03 Perforation Treatment Performed - Jet Perforation
1985-01-22 Perforation Treatment Performed - Cement Squeeze
1985-01-23 Well Log Performed
1985-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-24 Perforation Treatment Performed - Jet Perforation
1985-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-04 Perforation Treatment Performed - Jet Perforation
1987-11-25 Well Log Performed
1987-11-28 Perforation Treatment Performed - Cement Squeeze
1987-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-01 Perforation Treatment Performed - Jet Perforation
1987-12-01 Well Log Performed
1987-12-03 Perforation Treatment Performed - Cement Squeeze
1987-12-03 Well Log Performed
1987-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-04 Perforation Treatment Performed - Jet Perforation
1987-12-04 Well Log Performed
1987-12-08 Well Log Performed
1987-12-09 Perforation Treatment Performed - Cement Squeeze
1987-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-14 Perforation Treatment Performed - Jet Perforation
1987-12-14 Well Log Performed
2000-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-03 Plug Back Performed
2000-10-03 Well Log Performed
2000-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-04 Perforation Treatment Performed - Jet Perforation
2000-10-04 Plug Back Performed
2000-10-04 Well Log Performed
2000-10-11 Well Began Production
2000-10-11 Well Fluid changed to Gas
2000-10-11 Well Mode changed to Flowing
2000-10-12 Well Fluid changed to Gas
2000-10-12 Well Mode changed to Flowing
2011-03-10 Perforation Treatment Performed - Cement Squeeze
2011-03-28 Perforation Treatment Performed - Jet Perforation
2011-03-30 Perforation Treatment Performed - Cement Squeeze
2011-04-01 Perforation Treatment Performed - Jet Perforation
2011-04-03 Perforation Treatment Performed - Cement Squeeze
2011-04-05 Perforation Treatment Performed - Jet Perforation
2011-04-06 Perforation Treatment Performed - Cement Squeeze
2011-04-13 Well Log Performed
2011-04-26 Well Log Performed
2011-04-27 Well Log Performed
2011-05-03 Well Log Performed
2011-05-13 Perforation Treatment Performed - Jet Perforation
2011-05-14 Perforation Treatment Performed - Cement Squeeze
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended
2018-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-27 Plug Back Performed
2018-08-27 Well Fluid changed to Gas
2018-08-27 Well Log Performed
2018-08-27 Well Mode changed to Abandoned Zone
2018-08-28 Perforation Treatment Performed - Cement Plug
2018-08-28 Perforation Treatment Performed - Cement Squeeze
2018-08-28 Perforation Treatment Performed - Jet Perforation
2018-08-28 Plug Back Performed
2018-08-28 Well Log Performed
2018-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-29 Plug Back Performed
2018-09-04 Well Abandoned
2018-09-04 Well Fluid changed to Gas
2018-09-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-12-21 Bullet Perforation 1615.40 1617.00 20
1985-01-22 Cement Squeeze 1615.80 1615.90 0
1985-01-24 Perforation 1614.80 1614.90 10
1985-01-24 Acid Treatment 1614.80 1614.90 0
1985-10-04 Perforation 1614.50 1614.60 7
1985-10-04 Acid Treatment 1614.50 1614.90 0
1987-11-28 Cement Squeeze 1614.50 1614.90 0
1987-12-01 Perforation 1613.80 1614.00 13
1987-12-01 Acid Treatment 1613.80 1614.00 0
1987-12-03 Cement Squeeze 1613.80 1614.00 0
1987-12-04 Perforation 1606.00 1606.50 13
1973-09-11 Cement Squeeze 1615.40 1617.00 0
1987-12-04 Perforation 1607.40 1607.80 13
1987-12-04 Perforation 1608.50 1609.20 13
1987-12-04 Acid Treatment 1606.00 1609.20 0
1987-12-09 Cement Squeeze 1606.00 1609.20 0
1987-12-14 Perforation 1613.00 1613.50 13
1987-12-14 Acid Treatment 1613.00 1613.50 0
2000-10-03 Packing Device Capped w/Cement 1589.80 1590.80 0
2000-10-04 Packing Device Capped w/Cement 1297.80 1298.80 0
2000-10-04 Perforation 1282.30 1288.70 17
2011-03-10 Cement Squeeze 1282.30 1288.70 0
1973-09-13 Perforation 1616.00 1616.40 3
2011-03-28 Perforation 1281.00 1283.00 34
2011-03-30 Cement Squeeze 1281.00 1283.00 0
2011-04-01 Perforation 1074.00 1076.00 35
2011-04-03 Cement Squeeze 1074.00 1076.00 0
2011-04-05 Perforation 322.00 325.00 13
2011-04-06 Cement Squeeze 322.00 325.00 0
2011-05-13 Perforation 183.00 185.00 40
2011-05-13 Perforation 183.00 185.00 34
2011-05-14 Cement Squeeze 183.00 185.00 0
2018-08-27 Packing Device Capped w/Cement 1218.80 1326.20 0
1973-09-13 Perforation 1616.40 1616.70 13
2018-08-28 Perforation 1095.00 1096.00 13
2018-08-28 Cement Squeeze 1095.00 1096.00 0
2018-08-28 Perforation 1074.00 1076.00 13
2018-08-28 Cement Squeeze 1074.00 1076.00 0
2018-08-28 Cement Plug 1030.00 1112.00 0
2018-08-29 Packing Device Capped w/Cement 563.00 571.00 0
2018-08-29 Packing Device Capped w/Cement 309.00 317.00 0
2018-08-29 Packing Device Capped w/Cement 167.20 175.20 0
1973-09-14 Acid Wash 1616.00 1616.70 0
1982-08-30 Acid Treatment 1616.00 1616.70 0
1982-09-01 Cement Squeeze 1616.00 1616.70 0
1982-09-03 Perforation 1615.80 1615.90 10
1982-09-03 Acid Treatment 1615.80 1615.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1919 0.0 0.0 0.0
2001 7679 0.0 0.0 0.0
2002 8402 0.0 0.0 0.0
2003 8493 0.0 0.0 0.0
2004 7736 0.0 0.0 0.0
2005 6160 0.0 0.0 0.0
2006 7665 0.0 0.0 0.0
2007 8135 0.0 0.0 0.0
2008 8397 0.0 0.0 0.0
2009 8289 0.0 0.0 0.0
2010 8272 0.0 0.0 0.0
2011 576 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References