X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261607000

Well Details

Well ID: 0514261607000
Loading map...
Location: 00/07-16-051-26W4/0
Location Alias: 00/07-16-51-26 W4M
Location Alias 2: 00/07-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 43
Operator Name: Imperial Oil Resources Limited
License Number: 0002559
License Date: 1951-01-22
License Status: Abandoned
Spud Date: 1951-02-10
Final Drill Date: 1951-03-19
Well Total Depth: 1622.10 m
Surface Hole Latitude: 53.401501
Surface Hole Longitude: -113.772215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-22 Obtained License
1951-03-01 Drill Stem Test Performed
1951-03-02 Drill Stem Test Performed
1951-03-03 Drill Stem Test Performed
1951-03-09 Drill Stem Test Performed
1951-03-10 Drill Stem Test Performed
1951-03-12 Drill Stem Test Performed
1951-03-14 Liner Casing Operation Performed
1951-03-19 Finished Drilling
1951-03-19 Well Mode changed to Drilled and Cased
1951-03-22 Perforation Treatment Performed - Acid Wash - No Pressure
1951-03-22 Perforation Treatment Performed - Jet Perforation
1951-03-23 Well Began Production
1951-03-23 Well Fluid changed to Crude Oil
1951-03-23 Well Mode changed to Flowing
1972-02-18 Well Fluid changed to Crude Oil
1972-02-18 Well Mode changed to Pumping
1982-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-24 Perforation Treatment Performed - Cement Squeeze
1982-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-29 Perforation Treatment Performed - Jet Perforation
1982-07-05 Perforation Treatment Performed - Cement Squeeze
1982-07-05 Plug Back Performed
1982-07-07 Perforation Treatment Performed - Jet Perforation
1982-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-24 Well Fluid changed to Crude Oil
1986-07-24 Well Mode changed to Suspended
1988-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-02 Perforation Treatment Performed - Cement Squeeze
1988-02-03 Well Log Performed
1992-02-23 Well Log Performed
1992-08-06 Well Log Performed
1993-12-02 Well Log Performed
1994-06-09 Perforation Treatment Performed - Jet Perforation
1994-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-09 Perforation Treatment Performed - Jet Perforation
1996-10-09 Perforation Treatment Performed - Remedial Casing
1996-10-09 Plug Back Performed
1996-10-09 Well Fluid changed to Crude Oil
1996-10-09 Well Log Performed
1996-10-09 Well Mode changed to Abandoned Zone
1997-05-05 Well Abandoned
1997-05-05 Well Fluid changed to Crude Oil
1997-05-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-03-22 Perforation 1617.90 1619.40 13
1988-02-02 Cement Squeeze 1616.30 1616.50 0
1988-02-02 Packing Device Capped w/Cement 1585.10 1608.00 0
1994-06-09 Perforation 1515.50 1521.00 13
1994-06-11 Acid Treatment 1515.50 1521.00 0
1996-10-09 Packing Device Capped w/Cement 1506.00 1514.00 0
1996-10-09 Packing Device Capped w/Cement 1219.00 1227.00 0
1996-10-09 Perforation 160.00 161.00 13
1996-10-09 Remedial Casing Cementing 160.00 161.00 0
1996-10-09 Packing Device Capped w/Cement 96.60 165.00 0
1951-03-22 Acid Wash 1617.90 1619.40 0
1982-06-24 Acid Treatment 1617.90 1619.40 0
1982-06-24 Cement Squeeze 1617.90 1619.40 0
1982-06-29 Perforation 1617.90 1618.00 13
1982-06-29 Acid Treatment 1617.90 1618.00 0
1982-07-05 Cement Squeeze 1617.90 1618.00 0
1982-07-07 Perforation 1616.30 1616.50 13
1982-07-08 Acid Treatment 1616.30 1616.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8482 0.0 0.0 0.0
1968 7958 0.0 0.0 0.0
1969 8441 0.0 0.0 0.0
1970 8348 0.0 0.0 0.0
1971 2688 0.0 0.0 0.0
1972 7363 0.0 0.0 0.0
1973 8474 0.0 0.0 0.0
1974 8555 0.0 0.0 0.0
1975 7102 0.0 0.0 0.0
1976 8423 0.0 0.0 0.0
1977 6239 0.0 0.0 0.0
1978 6683 0.0 0.0 0.0
1981 275 0.0 0.0 0.0
1982 3581 0.0 0.0 0.0
1983 8175 0.0 0.0 0.0
1984 8312 0.0 0.0 0.0
1985 6864 0.0 0.0 0.0
1986 4020 0.0 0.0 0.0

For data sources see[5]

References