X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261608000

Well Details

Well ID: 0514261608000
Loading map...
Location: 00/08-16-051-26W4/0
Location Alias: 00/08-16-51-26 W4M
Location Alias 2: 00/08-16-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 8-16-51-26
Operator Name: NEP Canada ULC
License Number: 0002972
License Date: 1951-05-31
License Status: Suspension
Spud Date: 1951-07-02
Final Drill Date: 1951-07-29
Well Total Depth: 1620.30 m
Surface Hole Latitude: 53.401463
Surface Hole Longitude: -113.766850

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-31 Obtained License
1951-07-15 Drill Stem Test Performed
1951-07-16 Drill Stem Test Performed
1951-07-21 Drill Stem Test Performed
1951-07-24 Liner Casing Operation Performed
1951-07-29 Finished Drilling
1951-07-29 Well Mode changed to Drilled and Cased
1951-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1951-08-02 Perforation Treatment Performed - Jet Perforation
1951-08-02 Well Began Production
1951-08-02 Well Fluid changed to Crude Oil
1951-08-02 Well Mode changed to Pumping
1986-03-07 Perforation Treatment Performed - Cement Squeeze
1986-03-07 Well Log Performed
1986-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-11 Perforation Treatment Performed - Jet Perforation
1986-03-11 Well Log Performed
1986-03-18 Perforation Treatment Performed - Cement Squeeze
1986-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-20 Perforation Treatment Performed - Jet Perforation
1986-03-20 Well Log Performed
1988-12-04 Well Fluid changed to Crude Oil
1988-12-04 Well Mode changed to Suspended
1992-02-25 Well Log Performed
1996-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-12 Perforation Treatment Performed - Jet Perforation
1996-09-12 Plug Back Performed
1996-09-12 Well Log Performed
1996-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-21 Well Fluid changed to Crude Oil
1996-10-21 Well Mode changed to Suspended
2000-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-04 Plug Back Performed
2000-01-05 Perforation Treatment Performed - Jet Perforation
2000-01-10 Well Fluid changed to Crude Oil
2000-01-10 Well Mode changed to Suspended
2002-10-22 Perforation Treatment Performed - Cement Squeeze
2002-10-22 Plug Back Performed
2002-10-24 Perforation Treatment Performed - Jet Perforation
2002-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-30 Perforation Treatment Performed - Cement Squeeze
2002-11-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-11-05 Perforation Treatment Performed - Jet Perforation
2002-11-05 Well Log Performed
2002-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-02 Perforation 1616.70 1618.20 13
1996-09-12 Perforation 1501.10 1503.80 13
1996-09-12 Perforation 1507.50 1513.00 13
1996-09-12 Perforation 1517.80 1519.70 13
1996-09-12 Perforation 1522.60 1523.30 13
1996-09-17 Acid Treatment 1501.10 1523.30 0
1996-09-18 Acid Treatment 1501.10 1523.30 0
2000-01-04 Packing Device Capped w/Cement 1481.00 1489.00 0
2000-01-05 Perforation 1355.00 1359.00 18
2002-10-22 Cement Squeeze 1355.00 1359.00 0
2002-10-24 Perforation 1501.10 1503.80 13
1951-08-02 Acid Wash 1616.70 1618.20 0
2002-10-24 Perforation 1507.50 1513.00 13
2002-10-24 Perforation 1517.80 1519.70 13
2002-10-24 Perforation 1522.60 1523.30 13
2002-10-29 Acid Treatment 1501.10 1523.30 0
2002-10-30 Cement Squeeze 1501.10 1523.30 0
2002-11-05 Bridge Plug, No Cement 1610.20 1611.20 0
2002-11-05 Perforation 1584.50 1586.00 17
2002-11-06 Acid Treatment 1584.50 1586.00 0
2002-11-08 Packing Device Capped w/Cement 1551.00 1579.00 0
1986-03-07 Cement Squeeze 1616.70 1618.20 0
1986-03-11 Perforation 1615.30 1615.40 13
1986-03-11 Acid Treatment 1615.30 1615.40 0
1986-03-18 Cement Squeeze 1615.30 1615.40 0
1986-03-20 Perforation 1615.00 1615.10 13
1986-03-20 Acid Treatment 1615.00 1615.10 0
1996-09-12 Packing Device Capped w/Cement 1547.00 1555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 2778 0.0 0.0 0.0
1969 360 0.0 0.0 0.0
1970 5024 0.0 0.0 0.0
1971 2760 0.0 0.0 0.0
1972 8128 0.0 0.0 0.0
1973 8559 0.0 0.0 0.0
1974 8579 0.0 0.0 0.0
1975 8618 0.0 0.0 0.0
1976 8599 0.0 0.0 0.0
1977 8523 0.0 0.0 0.0
1978 8523 0.0 0.0 0.0
1979 8452 0.0 0.0 0.0
1980 8071 0.0 0.0 0.0
1981 8638 0.0 0.0 0.0
1982 8567 0.0 0.0 0.0
1983 8403 0.0 0.0 0.0
1984 8150 0.0 0.0 0.0
1985 7153 0.0 0.0 0.0
1986 6964 0.0 0.0 0.0
1987 8349 0.0 0.0 0.0
1988 7642 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2002-10-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References