X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261611003

Well Details

Well ID: 0514261611003
Loading map...
Location: 00/11-16-051-26W4/3
Location Alias: 00/11-16-51-26 W4M
Location Alias 2: 00/11-16-051-26 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 11-16-51-26
Operator Name: NEP Canada ULC
License Number: B0002333
License Date: 1948-09-06
License Status: Suspension
Spud Date: 1948-10-20
Final Drill Date: 1948-11-26
Well Total Depth: 1620.60 m
Surface Hole Latitude: 53.405186
Surface Hole Longitude: -113.778302

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-09-06 Obtained License
1948-11-04 Drill Stem Test Performed
1948-11-11 Drill Stem Test Performed
1948-11-12 Drill Stem Test Performed
1948-11-26 Finished Drilling
1948-11-26 Well Mode changed to Drilled and Cased
1948-11-27 Liner Casing Operation Performed
1948-12-01 Perforation Treatment Performed - Bullet Perforation
1960-08-26 Perforation Treatment Performed - Jet Perforation
1960-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-13 Perforation Treatment Performed - Acid Wash - No Pressure
1963-02-15 Perforation Treatment Performed - Cement Squeeze
1981-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-13 Perforation Treatment Performed - Cement Squeeze
1981-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-20 Perforation Treatment Performed - Selective Jet Perforations
1990-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-06 Well Log Performed
1990-06-07 Perforation Treatment Performed - Jet Perforation
1990-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-30 Well Log Performed
1992-05-01 Perforation Treatment Performed - Jet Perforation
1992-05-01 Well Log Performed
1992-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-04 Well Log Performed
1993-02-18 Perforation Treatment Performed - Jet Perforation
1993-02-18 Well Log Performed
1993-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-19 Well Log Performed
1994-11-01 Well Log Performed
1999-05-26 Well Mode changed to Drilled and Cased
1999-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-27 Plug Back Performed
1999-05-28 Perforation Treatment Performed - Jet Perforation
1999-06-24 Perforation Treatment Performed - Fractured
1999-07-08 Well Began Production
1999-07-08 Well Fluid changed to Gas
1999-07-08 Well Mode changed to Flowing
2013-03-01 Well Fluid changed to Gas
2013-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-12-01 Bullet Perforation 1617.00 1618.50 20
1981-04-13 Cement Squeeze 1617.00 1618.50 0
1981-04-20 Selective Jet Perforations 1617.20 1617.40 0
1981-04-20 Acid Treatment 1617.20 1617.40 0
1990-06-06 Packing Device Capped w/Cement 1613.50 1615.10 0
1990-06-07 Perforation 1612.90 1613.20 16
1990-06-08 Acid Treatment 1612.90 1613.20 0
1992-05-01 Perforation 1605.00 1606.50 13
1992-05-02 Acid Treatment 1605.00 1606.50 0
1993-02-18 Perforation 1585.00 1587.00 13
1993-02-18 Perforation 1587.00 1588.00 7
1960-08-26 Perforation 1383.80 1392.90 3
1993-02-18 Perforation 1592.00 1594.00 13
1993-02-18 Perforation 1594.00 1595.00 7
1993-02-19 Acid Treatment 1585.00 1595.00 0
1999-05-27 Packing Device Capped w/Cement 1567.00 1575.00 0
1999-05-28 Perforation 1338.00 1345.00 14
1999-06-24 Fracture 1338.00 1345.00 0
1960-08-26 Perforation 1374.60 1383.80 3
1960-08-26 Perforation 1365.50 1374.60 3
1960-08-26 Perforation 1358.20 1365.50 3
1960-08-28 Acid Treatment 1358.20 1392.90 0
1963-02-13 Acid Wash 1358.20 1385.90 0
1963-02-15 Cement Squeeze 1358.20 1392.90 0
1981-04-10 Acid Treatment 1617.00 1618.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4199 0.0 0.0 0.0
2000 8024 0.0 0.0 0.0
2001 8340 0.0 0.0 0.0
2002 8356 0.0 0.0 0.0
2003 8505 0.0 0.0 0.0
2004 8575 0.0 0.0 0.0
2005 8596 0.0 0.0 0.0
2006 7630 0.0 0.0 0.0
2007 8335 0.0 0.0 0.0
2008 8236 0.0 0.0 0.0
2009 8256 0.0 0.0 0.0
2010 8246 0.0 0.0 0.0
2011 7564 0.0 0.0 0.0

For data sources see[5]

References