X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514261612002

Well Details

Well ID: 0514261612002
Loading map...
Location: 00/12-16-051-26W4/2
Location Alias: 00/12-16-51-26 W4M
Location Alias 2: 00/12-16-051-26 W4/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 16
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND #67
Operator Name: Imperial Oil Resources Limited
License Number: 0002872
License Date: 1951-05-11
License Status: Abandoned
Spud Date: 1951-06-15
Final Drill Date: 1951-07-10
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.405207
Surface Hole Longitude: -113.784355

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-11 Obtained License
1951-06-27 Drill Stem Test Performed
1951-07-04 Drill Stem Test Performed
1951-07-07 Liner Casing Operation Performed
1951-07-10 Finished Drilling
1951-07-10 Well Mode changed to Drilled and Cased
1951-07-14 Perforation Treatment Performed - Acid Wash - No Pressure
1951-07-14 Perforation Treatment Performed - Bullet Perforation
1981-05-08 Perforation Treatment Performed - Cement Squeeze
1981-05-13 Perforation Treatment Performed - Selective Jet Perforations
1981-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-21 Well Log Performed
1993-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-22 Plug Back Performed
1993-10-24 Perforation Treatment Performed - Jet Perforation
1993-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-09 Well Began Production
1993-11-09 Well Fluid changed to Crude Oil
1993-11-09 Well Mode changed to Pumping
1994-07-01 Well Fluid changed to Crude Oil
1994-07-01 Well Mode changed to Suspended
1996-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-04 Perforation Treatment Performed - Jet Perforation
1996-09-04 Plug Back Performed
1996-09-04 Well Log Performed
1997-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-25 Perforation Treatment Performed - Remedial Casing
1997-05-07 Well Abandoned
1997-05-07 Well Fluid changed to Crude Oil
1997-05-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-07-14 Bullet Perforation 1617.90 1619.40 13
1996-09-04 Packing Device Capped w/Cement 1502.00 1510.00 0
1996-09-04 Packing Device Capped w/Cement 1237.00 1245.00 0
1996-09-04 Perforation 160.00 161.00 13
1997-04-25 Remedial Casing Cementing 160.00 161.00 0
1997-04-25 Packing Device Capped w/Cement 118.10 165.00 0
1951-07-14 Acid Wash 1617.90 1619.40 0
1981-05-08 Cement Squeeze 1617.90 1619.40 0
1981-05-13 Selective Jet Perforations 1617.70 1617.80 0
1981-05-14 Acid Treatment 1617.70 1617.80 0
1993-10-22 Packing Device Capped w/Cement 1560.50 1568.50 0
1993-10-24 Perforation 1520.00 1526.00 13
1993-10-24 Perforation 1527.00 1531.00 13
1993-10-25 Acid Treatment 1520.00 1531.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1111 0.0 0.0 0.0
1994 604 0.0 0.0 0.0

For data sources see[5]

References