X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262103000

Well Details

Well ID: 0514262103000
Loading map...
Location: 00/03-21-051-26W4/0
Location Alias: 00/03-21-51-26 W4M
Location Alias 2: 00/03-21-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 21
County/Municipality: Parkland County
Well Name: IMPERIAL WOODBEND NO. 16
Operator Name: Imperial Oil Limited
License Number: B0002522
License Date: 1948-12-06
License Status: RecExempt
Spud Date: 1948-12-30
Final Drill Date: 1949-02-25
Well Total Depth: 1624.60 m
Surface Hole Latitude: 53.412421
Surface Hole Longitude: -113.778250

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-12-06 Obtained License
1949-01-23 Drill Stem Test Performed
1949-01-26 Drill Stem Test Performed
1949-01-28 Drill Stem Test Performed
1949-01-30 Drill Stem Test Performed
1949-02-01 Drill Stem Test Performed
1949-02-02 Drill Stem Test Performed
1949-02-04 Drill Stem Test Performed
1949-02-25 Finished Drilling
1949-02-25 Well Mode changed to Drilled and Cased
1949-02-27 Liner Casing Operation Performed
1949-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
1949-03-08 Perforation Treatment Performed - Bullet Perforation
1949-03-12 Perforation Treatment Performed - Acid Wash - No Pressure
1949-03-12 Perforation Treatment Performed - Bullet Perforation
1949-03-16 Perforation Treatment Performed - Selective Bullet Perforations
1949-03-18 Perforation Treatment Performed - Cement Squeeze
1949-05-14 Perforation Treatment Performed - Jet Perforation
1949-06-01 Perforation Treatment Performed - Bullet Perforation
1949-06-03 Well Began Production
1949-06-03 Well Fluid changed to Crude Oil
1949-06-03 Well Mode changed to Flowing
1964-01-30 Well Fluid changed to Crude Oil
1964-01-30 Well Mode changed to Pumping
1972-06-02 Well Fluid changed to Crude Oil
1972-06-02 Well Mode changed to Pumping
1974-08-15 Perforation Treatment Performed - Cement Plug
1974-08-15 Well Fluid changed to Crude Oil
1974-08-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-03-08 Bullet Perforation 1619.70 1621.20 26
1949-03-08 Acid Wash 1619.70 1621.20 0
1949-03-12 Bullet Perforation 1619.70 1621.20 13
1949-03-12 Acid Wash 1619.70 1621.20 0
1949-03-16 Selective Bullet Perforations 1617.60 1617.60 0
1949-03-18 Cement Squeeze 1617.60 1617.60 0
1949-05-14 Perforation 1620.90 1622.50 7
1949-06-01 Bullet Perforation 1621.80 1623.40 20
1974-08-15 Cement Plug 1507.50 1623.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1972 48 0.0 0.0 0.0

For data sources see[5]

References