X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514262114003

Well Details

Well ID: 0514262114003
Loading map...
Location: 00/14-21-051-26W4/3
Location Alias: 00/14-21-51-26 W4M
Location Alias 2: 00/14-21-051-26 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 21
County/Municipality: Parkland County
Well Name: Canlin LEDUC-WB 14-21-51-26
Operator Name: Canlin Energy Corporation
License Number: 0003003
License Date: 1951-06-08
License Status: Suspension
Spud Date: 1951-06-22
Final Drill Date: 1951-07-20
Well Total Depth: 1682.20 m
Surface Hole Latitude: 53.423253
Surface Hole Longitude: -113.777066

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-08 Obtained License
1951-06-29 Drill Stem Test Performed
1951-07-01 Drill Stem Test Performed
1951-07-03 Drill Stem Test Performed
1951-07-09 Drill Stem Test Performed
1951-07-10 Drill Stem Test Performed
1951-07-11 Drill Stem Test Performed
1951-07-16 Liner Casing Operation Performed
1951-07-20 Finished Drilling
1951-07-20 Well Mode changed to Drilled and Cased
1951-08-04 Perforation Treatment Performed - Acid Wash - No Pressure
1951-08-04 Perforation Treatment Performed - Bullet Perforation
1951-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-09-22 Perforation Treatment Performed - Jet Perforation
1951-09-24 Perforation Treatment Performed - Cement Squeeze
1951-09-28 Perforation Treatment Performed - Jet Perforation
1951-09-30 Perforation Treatment Performed - Jet Perforation
1957-03-22 Perforation Treatment Performed - Cement Squeeze
1957-05-02 Perforation Treatment Performed - Jet Perforation
1957-05-09 Perforation Treatment Performed - Acid Wash - No Pressure
1957-05-10 Perforation Treatment Performed - Cement Squeeze
1957-05-16 Perforation Treatment Performed - Jet Perforation
1957-05-18 Perforation Treatment Performed - Acid Wash - No Pressure
1957-05-20 Perforation Treatment Performed - Acid Wash - No Pressure
1957-08-07 Perforation Treatment Performed - Cement Squeeze
1957-08-09 Perforation Treatment Performed - Jet Perforation
1957-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-01-06 Perforation Treatment Performed - Jet Perforation
1960-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-27 Well Log Performed
1999-01-28 Perforation Treatment Performed - Jet Perforation
1999-02-07 Well Began Production
1999-02-07 Well Fluid changed to Gas
1999-02-07 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-04 Bullet Perforation 1617.90 1619.40 13
1957-05-09 Acid Wash 1619.10 1620.60 0
1957-05-10 Cement Squeeze 1619.10 1620.60 0
1957-05-16 Perforation 1619.10 1620.60 13
1957-05-18 Acid Wash 1619.10 1620.60 0
1957-05-20 Acid Wash 1619.10 1620.60 0
1957-08-07 Cement Squeeze 1619.10 1620.60 0
1957-08-09 Perforation 1616.70 1617.30 13
1957-08-11 Acid Wash 1616.70 1617.30 0
1960-01-05 Packing Device Capped w/Cement 1463.00 1463.00 0
1960-01-06 Perforation 1061.00 1064.10 7
1951-08-04 Acid Wash 1617.90 1619.40 0
1960-01-06 Perforation 1048.50 1053.40 7
1960-01-06 Perforation 1043.30 1043.90 7
1960-01-07 Acid Treatment 1043.30 1064.10 0
1986-04-23 Acid Treatment 1048.50 1053.40 0
1986-04-24 Acid Treatment 1043.30 1043.90 0
1986-04-25 Acid Treatment 1061.00 1064.10 0
1999-01-28 Perforation 1217.00 1224.00 18
1951-08-07 Acid Treatment 1617.90 1619.40 0
1951-09-22 Perforation 1615.70 1616.00 13
1951-09-24 Cement Squeeze 1615.70 1616.00 0
1951-09-28 Perforation 1619.40 1620.90 13
1951-09-30 Perforation 1618.50 1620.30 13
1957-03-22 Cement Squeeze 1617.90 1620.90 0
1957-05-02 Perforation 1619.10 1620.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 7068 0.0 0.0 0.0
2000 8715 0.0 0.0 0.0
2001 8410 0.0 0.0 0.0
2002 8453 0.0 0.0 0.0
2003 6411 0.0 0.0 0.0
2004 8501 0.0 0.0 0.0
2005 8214 0.0 0.0 0.0
2006 7578 0.0 0.0 0.0
2007 8427 0.0 0.0 0.0
2008 8412 0.0 0.0 0.0
2009 8404 0.0 0.0 0.0
2010 8304 0.0 0.0 0.0
2011 8559 0.0 0.0 0.0
2012 6227 0.0 0.0 0.0

For data sources see[5]

References