If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514262809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.434019,"lon":-113.766094,"icon":""}]} |
Location: 00/09-28-051-26W4/0 | |
Location Alias: 00/09-28-51-26 W4M | |
Location Alias 2: 00/09-28-051-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Parkland County | |
Well Name: NORTH WOODBEND #9-C | |
Operator Name: Northwell Operators Limited | |
License Number: 0002463 | |
License Date: 1950-12-22 | |
License Status: RecExempt | |
Spud Date: 1950-12-29 | |
Final Drill Date: 1951-02-02 | |
Well Total Depth: 1661.20 m | |
Surface Hole Latitude: 53.434019 | |
Surface Hole Longitude: -113.766094 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-12-22 | Obtained License |
1951-01-06 | Drill Stem Test Performed |
1951-01-10 | Drill Stem Test Performed |
1951-01-11 | Drill Stem Test Performed |
1951-01-13 | Drill Stem Test Performed |
1951-01-14 | Drill Stem Test Performed |
1951-01-15 | Drill Stem Test Performed |
1951-01-17 | Drill Stem Test Performed |
1951-01-26 | Drill Stem Test Performed |
1951-01-27 | Drill Stem Test Performed |
1951-02-02 | Finished Drilling |
1951-02-02 | Well Mode changed to Drilled and Cased |
1951-02-05 | Production Casing Operation Performed |
1951-02-08 | Perforation Treatment Performed - Bullet Perforation |
1951-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1951-02-14 | Perforation Treatment Performed - Bullet Perforation |
1951-02-15 | Perforation Treatment Performed - Cement Squeeze |
1951-02-18 | Perforation Treatment Performed - Jet Perforation |
1951-02-19 | Well Began Production |
1951-02-19 | Well Fluid changed to Crude Oil |
1951-02-19 | Well Mode changed to Pumping |
1955-08-02 | Perforation Treatment Performed - Cement Squeeze |
1955-08-10 | Perforation Treatment Performed - Bullet Perforation |
1955-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-08-24 | Perforation Treatment Performed - Fractured |
1956-10-01 | Perforation Treatment Performed - Cement Plug |
1956-10-30 | Well Abandoned |
1956-10-30 | Well Fluid changed to Crude Oil |
1956-10-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-02-08 | Bullet Perforation | 1304.20 | 1304.80 | 26 |
1956-10-01 | Cement Plug | 1274.10 | 1307.60 | 0 |
1951-02-12 | Acid Treatment | 1304.20 | 1304.80 | 0 |
1951-02-14 | Bullet Perforation | 1310.30 | 1310.60 | 13 |
1951-02-15 | Cement Squeeze | 1304.20 | 1310.60 | 0 |
1951-02-18 | Perforation | 1303.00 | 1304.20 | 13 |
1955-08-02 | Cement Squeeze | 1303.00 | 1304.20 | 0 |
1955-08-10 | Bullet Perforation | 1302.70 | 1303.30 | 26 |
1955-08-24 | Acid Treatment | 1302.70 | 1303.30 | 0 |
1955-08-24 | Fracture | 1302.70 | 1303.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]