If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272216030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.423089,"lon":-113.889639,"icon":""}]} |
Location: 03/16-22-051-27W4/0 | |
Location Alias: 03/16-22-51-27 W4M | |
Location Alias 2: 03/16-22-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 22 | |
County/Municipality: Parkland County | |
Well Name: FREE REIN 103 GSPIKE 16-22-51-27 | |
Operator Name: Free Rein Resources Ltd. | |
License Number: 0050696 | |
License Date: 1974-08-01 | |
License Status: Suspension | |
Spud Date: 1974-08-11 | |
Final Drill Date: 1974-08-26 | |
Well Total Depth: 1828.80 m | |
Surface Hole Latitude: 53.423089 | |
Surface Hole Longitude: -113.889639 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-08-01 | Obtained License |
1974-08-26 | Finished Drilling |
1974-08-26 | Well Mode changed to Drilled and Cased |
1974-08-27 | Liner Casing Operation Performed |
1974-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-08-30 | Perforation Treatment Performed - Jet Perforation |
1974-09-19 | Well Began Production |
1974-09-19 | Well Fluid changed to Crude Oil |
1974-09-19 | Well Mode changed to Flowing |
1974-11-26 | Well Fluid changed to Crude Oil |
1974-11-26 | Well Mode changed to Gas Lift |
1978-06-28 | Perforation Treatment Performed - Cement Squeeze |
1978-07-05 | Perforation Treatment Performed - Jet Perforation |
1978-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-05-24 | Well Log Performed |
1989-03-14 | Well Log Performed |
1989-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-03-15 | Perforation Treatment Performed - Cement Squeeze |
1989-03-15 | Plug Back Performed |
1989-03-15 | Well Fluid changed to Crude Oil |
1989-03-15 | Well Log Performed |
1989-03-15 | Well Mode changed to Abandoned Zone |
1989-03-18 | Well Log Performed |
1989-03-19 | Perforation Treatment Performed - Cement Plug |
1989-03-19 | Perforation Treatment Performed - Jet Perforation |
1989-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-21 | Perforation Treatment Performed - Jet Perforation |
1989-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-10-15 | Perforation Treatment Performed - Cement Squeeze |
1995-10-22 | Perforation Treatment Performed - Jet Perforation |
1995-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-05-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-08-30 | Perforation | 1806.20 | 1815.40 | 3 |
1989-03-19 | Cement Plug | 1544.00 | 1605.00 | 0 |
1989-03-19 | Perforation | 1406.50 | 1413.50 | 13 |
1989-03-20 | Acid Treatment | 1406.50 | 1413.50 | 0 |
1989-03-21 | Perforation | 1368.00 | 1377.00 | 13 |
1989-03-21 | Perforation | 1380.00 | 1395.00 | 13 |
1989-03-22 | Acid Treatment | 1368.00 | 1395.00 | 0 |
1995-10-15 | Cement Squeeze | 1795.30 | 1802.00 | 0 |
1995-10-22 | Perforation | 1800.60 | 1803.60 | 13 |
1995-10-22 | Perforation | 1806.50 | 1807.50 | 13 |
1995-10-22 | Perforation | 1808.50 | 1809.50 | 13 |
1974-08-30 | Perforation | 1795.90 | 1804.40 | 3 |
1995-10-22 | Perforation | 1813.20 | 1815.70 | 13 |
1995-10-25 | Acid Treatment | 1806.50 | 1815.70 | 0 |
2005-05-10 | Acid Treatment | 1368.50 | 1413.50 | 0 |
1974-08-30 | Acid Treatment | 1795.90 | 1815.40 | 0 |
1974-08-30 | Acid Treatment | 1795.90 | 1815.40 | 0 |
1978-06-28 | Cement Squeeze | 1795.90 | 1815.40 | 0 |
1978-07-05 | Perforation | 1811.10 | 1815.40 | 3 |
1978-07-06 | Acid Treatment | 1811.10 | 1815.40 | 0 |
1989-03-15 | Cement Squeeze | 1811.10 | 1815.40 | 0 |
1989-03-15 | Packing Device Capped w/Cement | 1793.00 | 1795.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 2101 | 0.0 | 0.0 | 0.0 |
1975 | 6159 | 0.0 | 0.0 | 0.0 |
1976 | 5007 | 0.0 | 0.0 | 0.0 |
1977 | 4827 | 0.0 | 0.0 | 0.0 |
1978 | 4706 | 0.0 | 0.0 | 0.0 |
1979 | 1928 | 0.0 | 0.0 | 0.0 |
1980 | 1903 | 0.0 | 0.0 | 0.0 |
1981 | 4756 | 0.0 | 0.0 | 0.0 |
1982 | 5489 | 0.0 | 0.0 | 0.0 |
1983 | 6527 | 0.0 | 0.0 | 0.0 |
1984 | 8019 | 0.0 | 0.0 | 0.0 |
1985 | 6509 | 0.0 | 0.0 | 0.0 |
1986 | 3730 | 0.0 | 0.0 | 0.0 |
1987 | 5688 | 0.0 | 0.0 | 0.0 |
1988 | 4536 | 0.0 | 0.0 | 0.0 |
1989 | 546 | 0.0 | 0.0 | 0.0 |
For data sources see[5]