If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272311000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/11-23-051-27W4/0 | |
Location Alias: 00/11-23-51-27 W4M | |
Location Alias 2: 00/11-23-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 23 | |
County/Municipality: Parkland County | |
Well Name: IMP 11 GOLDEN SPIKE IN 11-23L-51-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0002667 | |
License Date: 1951-03-03 | |
License Status: Abandoned | |
Spud Date: 1951-03-30 | |
Final Drill Date: 1951-05-20 | |
Well Total Depth: 2047.30 m | |
Surface Hole Latitude: 53.419291 | |
Surface Hole Longitude: -113.876367 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-03-03 | Obtained License |
1951-04-13 | Drill Stem Test Performed |
1951-04-14 | Drill Stem Test Performed |
1951-04-15 | Drill Stem Test Performed |
1951-04-16 | Drill Stem Test Performed |
1951-04-20 | Drill Stem Test Performed |
1951-04-23 | Drill Stem Test Performed |
1951-04-24 | Drill Stem Test Performed |
1951-05-09 | Drill Stem Test Performed |
1951-05-11 | Drill Stem Test Performed |
1951-05-13 | Drill Stem Test Performed |
1951-05-14 | Drill Stem Test Performed |
1951-05-16 | Drill Stem Test Performed |
1951-05-18 | Drill Stem Test Performed |
1951-05-20 | Finished Drilling |
1951-05-20 | Well Mode changed to Drilled and Cased |
1951-05-21 | Perforation Treatment Performed - Open-Hole Completion |
1951-05-23 | Well Began Production |
1951-05-23 | Well Fluid changed to Crude Oil |
1951-05-23 | Well Mode changed to Flowing |
1955-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-11-13 | Perforation Treatment Performed - Open-Hole Completion |
1964-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-01-11 | Liner Casing Operation Performed |
1965-01-11 | Perforation Treatment Performed - Slotted Liner or Casing |
1974-03-04 | Perforation Treatment Performed - Cement Squeeze |
1974-03-05 | Perforation Treatment Performed - Cement Squeeze |
1974-03-11 | Perforation Treatment Performed - Cement Squeeze |
1974-03-15 | Perforation Treatment Performed - Cement Plug |
1974-03-21 | Perforation Treatment Performed - Jet Perforation |
1974-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-06-04 | Well Fluid changed to Crude Oil |
1975-06-04 | Well Mode changed to Pumping |
1978-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-03-22 | Perforation Treatment Performed - Jet Perforation |
1978-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1978-05-12 | Well Fluid changed to Crude Oil |
1978-05-12 | Well Mode changed to Flowing |
1985-01-02 | Well Began Injection |
1985-01-02 | Well Fluid changed to Gas |
1985-01-02 | Well Type changed to Injection |
1998-11-12 | Well Log Performed |
2010-07-01 | Well Fluid changed to Gas |
2010-07-01 | Well Mode changed to Suspended |
2010-07-01 | Well Type changed to Injection |
2010-09-20 | Perforation Treatment Performed - Cement Plug |
2010-09-20 | Plug Back Performed |
2010-09-20 | Well Fluid changed to Gas |
2010-09-20 | Well Mode changed to Abandoned Zone |
2010-09-20 | Well Type changed to Injection |
2010-09-21 | Perforation Treatment Performed - Jet Perforation |
2010-09-21 | Well Log Performed |
2010-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-29 | Perforation Treatment Performed - Cement Plug |
2010-09-29 | Perforation Treatment Performed - Jet Perforation |
2010-09-29 | Well Log Performed |
2010-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-01 | Perforation Treatment Performed - Cement Plug |
2010-10-01 | Perforation Treatment Performed - Jet Perforation |
2010-10-01 | Well Log Performed |
2011-12-09 | Well Abandoned |
2011-12-09 | Well Fluid changed to Gas |
2011-12-09 | Well Mode changed to Abandoned |
2011-12-09 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-05-21 | Open Hole/Barefoot Completion | 1626.70 | 1798.30 | 0 |
1964-11-17 | Acid Treatment | 1749.60 | 1755.60 | 0 |
1964-11-17 | Acid Treatment | 1758.70 | 1764.80 | 0 |
1964-11-17 | Acid Treatment | 1767.80 | 1773.90 | 0 |
1965-01-11 | Slotted Liner | 1692.60 | 1793.10 | 0 |
1974-03-04 | Cement Squeeze | 1747.70 | 1790.40 | 0 |
1974-03-05 | Cement Squeeze | 1744.70 | 1747.70 | 0 |
1974-03-11 | Cement Squeeze | 1741.30 | 1783.10 | 0 |
1974-03-15 | Cement Plug | 1692.60 | 1783.10 | 0 |
1974-03-21 | Perforation | 1769.40 | 1773.90 | 7 |
1974-03-21 | Perforation | 1764.80 | 1769.40 | 3 |
1955-09-06 | Acid Treatment | 1626.70 | 1798.30 | 0 |
1974-03-27 | Acid Treatment | 1764.80 | 1773.90 | 0 |
1978-03-16 | Packing Device Capped w/Cement | 1761.70 | 1761.70 | 0 |
1978-03-22 | Perforation | 1728.20 | 1742.90 | 7 |
1978-03-23 | Acid Treatment | 1728.20 | 1742.90 | 0 |
1978-03-23 | Acid Wash | 1728.20 | 1742.90 | 0 |
2010-09-20 | Cement Plug | 1530.00 | 1723.50 | 0 |
2010-09-21 | Perforation | 587.00 | 588.00 | 17 |
2010-09-22 | Packing Device Capped w/Cement | 572.00 | 579.00 | 0 |
2010-09-29 | Perforation | 501.00 | 502.00 | 17 |
2010-09-29 | Perforation | 480.00 | 481.00 | 17 |
1957-09-06 | Acid Treatment | 1626.70 | 1798.30 | 0 |
2010-09-29 | Perforation | 434.00 | 435.00 | 17 |
2010-09-29 | Perforation | 382.00 | 383.00 | 17 |
2010-09-29 | Perforation | 360.00 | 361.00 | 17 |
2010-09-29 | Perforation | 343.00 | 344.00 | 17 |
2010-09-29 | Cement Plug | 343.00 | 565.00 | 0 |
2010-09-29 | Packing Device Capped w/Cement | 318.00 | 332.00 | 0 |
2010-10-01 | Perforation | 279.00 | 280.00 | 17 |
2010-10-01 | Perforation | 255.00 | 256.00 | 17 |
2010-10-01 | Perforation | 235.00 | 236.00 | 17 |
2010-10-01 | Perforation | 212.00 | 213.00 | 17 |
1964-11-13 | Open Hole/Barefoot Completion | 1626.70 | 1793.10 | 0 |
2010-10-01 | Cement Plug | 212.00 | 317.00 | 0 |
2010-10-01 | Packing Device Capped w/Cement | 187.00 | 201.00 | 0 |
1964-11-16 | Acid Treatment | 1703.80 | 1709.90 | 0 |
1964-11-16 | Acid Treatment | 1713.00 | 1719.10 | 0 |
1964-11-17 | Acid Treatment | 1722.10 | 1728.20 | 0 |
1964-11-17 | Acid Treatment | 1731.30 | 1737.40 | 0 |
1964-11-17 | Acid Treatment | 1740.40 | 1746.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 1533 | 0.0 | 0.0 | 0.0 |
1972 | 4815 | 0.0 | 0.0 | 0.0 |
1973 | 7321 | 0.0 | 0.0 | 0.0 |
1974 | 2738 | 0.0 | 0.0 | 0.0 |
1975 | 1371 | 0.0 | 0.0 | 0.0 |
1976 | 2176 | 0.0 | 0.0 | 0.0 |
1977 | 2037 | 0.0 | 0.0 | 0.0 |
1978 | 1936 | 0.0 | 0.0 | 0.0 |
1979 | 2768 | 0.0 | 0.0 | 0.0 |
1980 | 6056 | 0.0 | 0.0 | 0.0 |
1981 | 393 | 0.0 | 0.0 | 0.0 |
1982 | 50 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]