If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272311070 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.420192,"lon":-113.87489,"icon":""}]} |
Location: 07/11-23-051-27W4/0 | |
Location Alias: 07/11-23-51-27 W4M | |
Location Alias 2: 07/11-23-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 23 | |
County/Municipality: Parkland County | |
Well Name: ESSO GOLDEN SPIKE 11D-23-51-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0072582 | |
License Date: 1978-10-24 | |
License Status: RecCertified | |
Spud Date: 1978-12-29 | |
Final Drill Date: 1979-01-18 | |
Well Total Depth: 1821.00 m | |
Surface Hole Latitude: 53.420192 | |
Surface Hole Longitude: -113.874890 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-10-24 | Obtained License |
1979-01-18 | Finished Drilling |
1979-01-18 | Well Mode changed to Drilled and Cased |
1979-01-21 | Liner Casing Operation Performed |
1979-01-29 | Perforation Treatment Performed - Jet Perforation |
1979-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-02-11 | Well Began Production |
1979-02-11 | Well Fluid changed to Crude Oil |
1979-02-11 | Well Mode changed to Flowing |
1989-05-21 | Well Log Performed |
1989-05-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-05-22 | Well Log Performed |
1989-05-23 | Perforation Treatment Performed - Jet Perforation |
1989-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-01 | Well Began Injection |
1989-11-01 | Well Fluid changed to Gas |
1989-11-01 | Well Type changed to Injection |
1991-10-01 | Well Fluid changed to Gas |
1991-10-01 | Well Type changed to Storage |
2010-06-01 | Well Fluid changed to Gas |
2010-06-01 | Well Mode changed to Suspended |
2010-06-01 | Well Type changed to Storage |
2011-03-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-30 | Plug Back Performed |
2011-03-30 | Well Fluid changed to Gas |
2011-03-30 | Well Mode changed to Abandoned Zone |
2011-03-30 | Well Type changed to Storage |
2011-03-31 | Perforation Treatment Performed - Jet Perforation |
2011-04-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-04-01 | Perforation Treatment Performed - Remedial Casing |
2011-12-02 | Well Abandoned |
2011-12-02 | Well Fluid changed to Gas |
2011-12-02 | Well Mode changed to Abandoned |
2011-12-02 | Well Type changed to Storage |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-01-29 | Perforation | 1801.00 | 1803.00 | 6 |
2011-03-30 | Packing Device Capped w/Cement | 1231.00 | 1623.00 | 0 |
2011-03-31 | Perforation | 279.00 | 280.00 | 17 |
2011-04-01 | Remedial Casing Cementing | 279.00 | 280.00 | 0 |
2011-04-01 | Packing Device Capped w/Cement | 262.50 | 270.50 | 0 |
1979-01-31 | Acid Treatment | 1801.00 | 1803.00 | 0 |
1989-05-22 | Packing Device Capped w/Cement | 1727.00 | 1728.00 | 0 |
1989-05-23 | Perforation | 1654.00 | 1663.00 | 13 |
1989-05-23 | Perforation | 1666.00 | 1669.00 | 13 |
1989-05-23 | Perforation | 1673.00 | 1677.00 | 13 |
1989-05-23 | Perforation | 1680.00 | 1689.50 | 13 |
1989-05-23 | Perforation | 1692.50 | 1705.00 | 13 |
1989-05-25 | Acid Treatment | 1654.00 | 1705.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 3064 | 0.0 | 0.0 | 0.0 |
1980 | 1718 | 0.0 | 0.0 | 0.0 |
1981 | 4504 | 0.0 | 0.0 | 0.0 |
1982 | 1143 | 0.0 | 0.0 | 0.0 |
1983 | 5883 | 0.0 | 0.0 | 0.0 |
1984 | 6667 | 0.0 | 0.0 | 0.0 |
1986 | 808 | 0.0 | 0.0 | 0.0 |
1987 | 6129 | 0.0 | 0.0 | 0.0 |
1988 | 4167 | 0.0 | 0.0 | 0.0 |
1989 | 937 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 281 | 0.0 | 0.0 | 0.0 |
1992 | 2355 | 0.0 | 0.0 | 0.0 |
1993 | 2290 | 0.0 | 0.0 | 0.0 |
1994 | 2489 | 0.0 | 0.0 | 0.0 |
1995 | 1744 | 0.0 | 0.0 | 0.0 |
1996 | 2191 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 1459 | 0.0 | 0.0 | 0.0 |
1999 | 2160 | 0.0 | 0.0 | 0.0 |
2000 | 1302 | 0.0 | 0.0 | 0.0 |
2001 | 8503 | 0.0 | 0.0 | 0.0 |
2002 | 8759 | 0.0 | 0.0 | 0.0 |
2003 | 8711 | 0.0 | 0.0 | 0.0 |
2004 | 8735 | 0.0 | 0.0 | 0.0 |
2005 | 8717 | 0.0 | 0.0 | 0.0 |
2006 | 8447 | 0.0 | 0.0 | 0.0 |
2007 | 8447 | 0.0 | 0.0 | 0.0 |
2008 | 8615 | 0.0 | 0.0 | 0.0 |
2009 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]