X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272314070

Well Details

Well ID: 0514272314070
Loading map...
Location: 07/14-23-051-27W4/0
Location Alias: 07/14-23-51-27 W4M
Location Alias 2: 07/14-23-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 23
County/Municipality: Parkland County
Well Name: IMP GOLDEN SPIKE A14B-23-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0067312
License Date: 1977-12-07
License Status: RecCertified
Spud Date: 1978-10-27
Final Drill Date: 1978-11-14
Well Total Depth: 1818.00 m
Surface Hole Latitude: 53.421867
Surface Hole Longitude: -113.878470

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-12-07 Obtained License
1978-11-14 Finished Drilling
1978-11-14 Well Mode changed to Drilled and Cased
1978-11-16 Liner Casing Operation Performed
1978-12-07 Perforation Treatment Performed - Jet Perforation
1978-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-11 Well Began Production
1978-12-11 Well Fluid changed to Crude Oil
1978-12-11 Well Mode changed to Gas Lift
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2010-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-19 Plug Back Performed
2010-09-19 Well Fluid changed to Crude Oil
2010-09-19 Well Mode changed to Abandoned Zone
2010-09-20 Perforation Treatment Performed - Jet Perforation
2010-09-20 Well Log Performed
2010-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-12 Well Abandoned
2011-08-12 Well Fluid changed to Crude Oil
2011-08-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-07 Perforation 1801.00 1806.00 7
1978-12-08 Acid Treatment 1801.00 1806.00 0
2010-09-19 Packing Device Capped w/Cement 1245.00 1790.10 0
2010-09-20 Perforation 218.00 219.00 17
2010-09-20 Perforation 193.00 194.00 17
2010-09-20 Perforation 189.00 190.00 17
2010-09-21 Packing Device Capped w/Cement 189.00 222.00 0
2010-09-21 Packing Device Capped w/Cement 167.00 186.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 212 0.0 0.0 0.0
1979 1514 0.0 0.0 0.0
1980 2093 0.0 0.0 0.0
1981 1596 0.0 0.0 0.0
1982 1628 0.0 0.0 0.0
1983 228 0.0 0.0 0.0
1984 2889 0.0 0.0 0.0
1986 2708 0.0 0.0 0.0
1987 7937 0.0 0.0 0.0
1988 3998 0.0 0.0 0.0
1989 7396 0.0 0.0 0.0
1990 2784 0.0 0.0 0.0
1991 3439 0.0 0.0 0.0
1992 198 0.0 0.0 0.0
1993 706 0.0 0.0 0.0
1994 1492 0.0 0.0 0.0
1995 4946 0.0 0.0 0.0
1996 8583 0.0 0.0 0.0
1997 4054 0.0 0.0 0.0
1998 2432 0.0 0.0 0.0
1999 6181 0.0 0.0 0.0
2000 8709 0.0 0.0 0.0
2001 1422 0.0 0.0 0.0
2002 4367 0.0 0.0 0.0

For data sources see[5]

References