X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272412003

Well Details

Well ID: 0514272412003
Loading map...
Location: 00/12-24-051-27W4/3
Location Alias: 00/12-24-51-27 W4M
Location Alias 2: 00/12-24-051-27 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 24
County/Municipality: Parkland County
Well Name: CEDAR CREEK GSPIKE 12-24-51-27
Operator Name: MAGA Energy Operations Ltd.
License Number: 0016179
License Date: 1958-11-05
License Status: Suspension
Spud Date: 1958-11-13
Final Drill Date: 1976-06-08
Well Total Depth: 1818.10 m
Surface Hole Latitude: 53.419311
Surface Hole Longitude: -113.858554

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-05 Obtained License
1958-11-18 Drill Stem Test Performed
1958-11-20 Drill Stem Test Performed
1958-11-21 Drill Stem Test Performed
1958-11-22 Drill Stem Test Performed
1958-11-24 Drill Stem Test Performed
1958-11-25 Drill Stem Test Performed
1958-11-26 Drill Stem Test Performed
1958-11-27 Drill Stem Test Performed
1958-11-29 Drill Stem Test Performed
1958-12-03 Drill Stem Test Performed
1959-01-20 Perforation Treatment Performed - Open-Hole Completion
1959-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-11 Perforation Treatment Performed - Fractured
1959-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-07 Drill Stem Test Performed
1976-06-08 Finished Drilling
1976-06-08 Liner Casing Operation Performed
1976-06-08 Perforation Treatment Performed - Cement Squeeze
1976-06-10 Perforation Treatment Performed - Open-Hole Completion
1976-06-11 Perforation Treatment Performed - Jet Perforation
1976-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-16 Perforation Treatment Performed - Cement Plug
1976-06-16 Perforation Treatment Performed - Open-Hole Completion
1976-06-18 Well Mode changed to Drilled and Cased
1983-09-13 Well Log Performed
1983-09-16 Well Log Performed
1983-09-29 Perforation Treatment Performed - Jet Perforation
1983-09-29 Well Mode changed to Drilled and Cased
1984-09-21 Well Began Production
1984-09-21 Well Fluid changed to Crude Oil
1984-09-21 Well Mode changed to Pumping
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Suspended
1987-10-23 Well Log Performed
1987-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1987-10-27 Perforation Treatment Performed - Cement Squeeze
1987-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-03 Well Fluid changed to Crude Oil
1987-11-03 Well Mode changed to Abandoned Zone
1987-11-04 Perforation Treatment Performed - Jet Perforation
1987-11-04 Well Log Performed
1987-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-18 Well Log Performed
1994-07-21 Perforation Treatment Performed - Jet Perforation
1994-07-21 Well Log Performed
1994-07-22 Perforation Treatment Performed - Fractured
1994-07-29 Well Log Performed
1994-07-30 Perforation Treatment Performed - Jet Perforation
1995-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-11 Perforation Treatment Performed - Jet Perforation
1998-02-11 Well Log Performed
1998-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-07 Perforation Treatment Performed - Jet Perforation
2002-03-07 Well Log Performed
2008-11-19 Perforation Treatment Performed - Cement Squeeze
2008-11-19 Plug Back Performed
2008-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-17 Perforation Treatment Performed - Jet Perforation
2009-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-04 Perforation Treatment Performed - Chemical Squeeze
2012-06-12 Perforation Treatment Performed - Jet Perforation
2013-11-13 Perforation Treatment Performed - Cement Squeeze
2013-11-13 Plug Back Performed
2013-11-22 Perforation Treatment Performed - Cement Squeeze
2013-11-22 Plug Back Performed
2013-12-05 Perforation Treatment Performed - Jet Perforation
2013-12-10 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-01-20 Open Hole/Barefoot Completion 1759.30 1805.00 0
1976-06-14 Acid Treatment 1807.50 1818.10 0
1976-06-16 Cement Plug 1813.90 1818.10 0
1976-06-16 Open Hole/Barefoot Completion 1807.50 1813.90 0
1983-09-29 Perforation 1267.50 1270.50 7
1987-10-27 Acid Wash 1267.50 1270.50 0
1987-10-27 Cement Squeeze 1267.50 1270.50 0
1987-11-03 Packing Device Capped w/Cement 1803.50 1804.00 0
1987-11-04 Perforation 1796.50 1799.30 13
1987-11-05 Acid Treatment 1796.50 1799.30 0
1994-07-18 Packing Device Capped w/Cement 1708.00 1716.00 0
1959-01-21 Acid Treatment 1759.30 1805.00 0
1994-07-21 Perforation 1271.00 1274.00 13
1994-07-22 Fracture 1271.00 1274.00 0
1994-07-30 Perforation 1373.70 1379.50 13
1994-07-30 Perforation 1381.00 1385.90 13
1995-10-04 Acid Treatment 1373.70 1385.90 0
1998-02-11 Perforation 1396.00 1400.00 13
1998-02-11 Perforation 1401.50 1402.50 13
1998-02-12 Acid Treatment 1396.00 1402.50 0
2002-03-07 Perforation 1264.00 1274.00 13
2008-11-19 Cement Squeeze 1264.00 1274.00 0
1959-01-31 Acid Treatment 1759.30 1805.00 0
2008-12-02 Acid Treatment 1373.70 1385.90 0
2009-06-17 Perforation 1411.50 1418.50 20
2009-06-18 Acid Treatment 1411.50 1418.50 0
2009-06-19 Acid Treatment 1411.50 1418.50 0
2009-11-04 Chemical Squeeze 1373.70 1418.50 0
2012-06-12 Perforation 1264.00 1270.00 20
2013-11-13 Cement Squeeze 1264.00 1270.00 0
2013-11-22 Cement Squeeze 1373.70 1418.50 0
2013-12-05 Perforation 1796.50 1799.30 13
2013-12-10 Perforation 1760.00 1765.00 20
1959-02-11 Fracture 1759.30 1805.00 0
2013-12-10 Perforation 1771.00 1777.00 20
2013-12-10 Perforation 1793.50 1797.50 20
2013-12-10 Perforation 1766.50 1769.00 20
2013-12-10 Perforation 1789.50 1793.50 20
1959-02-11 Acid Treatment 1759.30 1805.00 0
1959-02-20 Acid Treatment 1759.30 1805.00 0
1976-06-08 Cement Squeeze 1759.30 1805.00 0
1976-06-10 Open Hole/Barefoot Completion 1807.50 1818.10 0
1976-06-11 Perforation 1812.00 1814.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1298 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-12 No Incident Encountered 0.00 0.00
2013-12-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References