X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272413000

Well Details

Well ID: 0514272413000
Loading map...
Location: 00/13-24-051-27W4/0
Location Alias: 00/13-24-51-27 W4M
Location Alias 2: 00/13-24-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 24
County/Municipality: Parkland County
Well Name: POST GOLDEN SPIKE 13-24-51-27
Operator Name: Obsidian Energy Ltd.
License Number: 0017260
License Date: 1959-06-16
License Status: RecCertified
Spud Date: 1959-07-13
Final Drill Date: 1959-08-29
Well Total Depth: 1814.50 m
Surface Hole Latitude: 53.422336
Surface Hole Longitude: -113.858804

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-16 Obtained License
1959-07-13 Direction Drilling Operation Performed - 98
1959-07-23 Drill Stem Test Performed
1959-08-15 Drill Stem Test Performed
1959-08-29 Finished Drilling
1959-08-29 Well Mode changed to Drilled and Cased
1959-08-30 Production Casing Operation Performed
1959-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-02 Perforation Treatment Performed - Acid Wash - No Pressure
1959-09-02 Perforation Treatment Performed - Open-Hole Completion
1959-09-10 Well Began Production
1959-09-10 Well Fluid changed to Crude Oil
1959-09-10 Well Mode changed to Flowing
1960-02-22 Well Fluid changed to Crude Oil
1960-02-22 Well Mode changed to Gas Lift
1969-08-02 Well Fluid changed to Crude Oil
1969-08-02 Well Mode changed to Pumping
1988-06-01 Well Fluid changed to Crude Oil
1988-06-01 Well Mode changed to Suspended
1993-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-29 Perforation Treatment Performed - Jet Perforation
1993-06-29 Well Log Performed
1993-09-09 Well Log Performed
1993-09-10 Perforation Treatment Performed - Cement Squeeze
1993-09-13 Well Log Performed
1993-09-14 Perforation Treatment Performed - Jet Perforation
1993-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
1995-10-03 Perforation Treatment Performed - Jet Perforation
1995-10-03 Well Fluid changed to Crude Oil
1995-10-03 Well Log Performed
1995-10-03 Well Mode changed to Suspended
1998-02-09 Perforation Treatment Performed - Fractured
2002-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-22 Plug Back Performed
2002-10-22 Well Fluid changed to Crude Oil
2002-10-22 Well Mode changed to Abandoned Zone
2004-08-07 Well Log Performed
2004-08-13 Perforation Treatment Performed - Cement Plug
2004-08-13 Perforation Treatment Performed - Jet Perforation
2004-08-13 Perforation Treatment Performed - Remedial Casing
2004-08-13 Plug Back Performed
2004-08-13 Well Log Performed
2004-08-16 Perforation Treatment Performed - Cement Plug
2004-08-16 Perforation Treatment Performed - Jet Perforation
2004-08-16 Perforation Treatment Performed - Remedial Casing
2004-08-16 Plug Back Performed
2004-08-16 Well Log Performed
2004-08-20 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1959-07-13 1543.80 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-02 Open Hole/Barefoot Completion 1804.40 1814.50 0
1995-10-03 Perforation 1321.00 1323.50 17
1998-02-09 Fracture 1321.00 1323.50 0
2002-10-22 Packing Device Capped w/Cement 1310.00 1318.00 0
2004-08-13 Perforation 1214.50 1215.50 13
2004-08-13 Perforation 1112.70 1113.70 13
2004-08-13 Remedial Casing Cementing 1214.50 1215.50 0
2004-08-13 Remedial Casing Cementing 1112.70 1113.70 0
2004-08-13 Cement Plug 1047.70 1235.40 0
2004-08-16 Perforation 517.20 518.20 13
2004-08-16 Perforation 233.70 234.70 13
1959-09-02 Acid Wash 1804.40 1814.50 0
2004-08-16 Remedial Casing Cementing 517.20 518.20 0
2004-08-16 Remedial Casing Cementing 233.70 234.70 0
2004-08-16 Cement Plug 166.20 535.00 0
1959-09-02 Acid Treatment 1804.40 1814.50 0
1993-06-24 Acid Treatment 1808.40 1814.50 0
1993-06-29 Perforation 1327.00 1328.50 13
1993-06-29 Perforation 1332.00 1333.50 13
1993-09-10 Cement Squeeze 1327.00 1333.50 0
1993-09-14 Perforation 1332.00 1333.50 14
1993-09-16 Acid Treatment 1332.00 1333.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3497 0.0 0.0 0.0
1968 3613 0.0 0.0 0.0
1969 2717 0.0 0.0 0.0
1970 3462 0.0 0.0 0.0
1971 4602 0.0 0.0 0.0
1972 7275 0.0 0.0 0.0
1973 8044 0.0 0.0 0.0
1974 7332 0.0 0.0 0.0
1975 7451 0.0 0.0 0.0
1976 6843 0.0 0.0 0.0
1977 8735 0.0 0.0 0.0
1978 8391 0.0 0.0 0.0
1979 8564 0.0 0.0 0.0
1980 8673 0.0 0.0 0.0
1981 8659 0.0 0.0 0.0
1982 8147 0.0 0.0 0.0
1983 8687 0.0 0.0 0.0
1984 8450 0.0 0.0 0.0
1985 8395 0.0 0.0 0.0
1986 1992 0.0 0.0 0.0
1987 1358 0.0 0.0 0.0
1988 3647 0.0 0.0 0.0

For data sources see[6]

References