X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272604030

Well Details

Well ID: 0514272604030
Loading map...
Location: 03/04-26-051-27W4/0
Location Alias: 03/04-26-51-27 W4M
Location Alias 2: 03/04-26-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 26
County/Municipality: Parkland County
Well Name: IMP GOLDEN SPIKE 4B-26-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0046852
License Date: 1973-08-09
License Status: Abandoned
Spud Date: 1973-10-03
Final Drill Date: 1973-10-19
Well Total Depth: 1820.60 m
Surface Hole Latitude: 53.425297
Surface Hole Longitude: -113.882633

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-08-09 Obtained License
1973-10-19 Finished Drilling
1973-10-19 Well Mode changed to Drilled and Cased
1973-10-20 Drill Stem Test Performed
1973-10-21 Drill Stem Test Performed
1973-10-23 Liner Casing Operation Performed
1973-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-17 Perforation Treatment Performed - Jet Perforation
1973-12-23 Well Began Production
1973-12-23 Well Fluid changed to Crude Oil
1973-12-23 Well Mode changed to Gas Lift
1977-03-16 Perforation Treatment Performed - Cement Squeeze
1977-03-17 Perforation Treatment Performed - Cement Squeeze
1977-03-18 Perforation Treatment Performed - Cement Squeeze
1977-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-30 Well Log Performed
1989-07-02 Perforation Treatment Performed - Jet Perforation
1989-07-03 Well Log Performed
1989-07-04 Well Log Performed
1989-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-01 Well Began Injection
1989-10-01 Well Fluid changed to Gas
1989-10-01 Well Type changed to Injection
1991-10-01 Well Fluid changed to Gas
1991-10-01 Well Type changed to Storage
2010-06-01 Well Fluid changed to Gas
2010-06-01 Well Mode changed to Suspended
2010-06-01 Well Type changed to Storage
2010-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-12 Plug Back Performed
2010-09-12 Well Fluid changed to Gas
2010-09-12 Well Mode changed to Abandoned Zone
2010-09-12 Well Type changed to Storage
2010-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-13 Perforation Treatment Performed - Jet Perforation
2010-09-13 Perforation Treatment Performed - Remedial Casing
2010-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-15 Perforation Treatment Performed - Cement Plug
2010-09-15 Perforation Treatment Performed - Jet Perforation
2010-09-15 Perforation Treatment Performed - Remedial Casing
2011-12-07 Well Abandoned
2011-12-07 Well Fluid changed to Gas
2011-12-07 Well Mode changed to Abandoned
2011-12-07 Well Type changed to Storage

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-12-17 Perforation 1773.30 1788.60 3
1989-07-02 Perforation 1634.00 1649.00 13
1989-07-02 Perforation 1656.00 1669.00 13
1989-07-02 Perforation 1674.00 1686.00 13
1989-07-02 Perforation 1689.50 1704.00 13
1989-07-06 Acid Treatment 1634.00 1704.00 0
2010-09-12 Packing Device Capped w/Cement 1250.00 1628.00 0
2010-09-13 Perforation 576.00 577.00 17
2010-09-13 Remedial Casing Cementing 576.00 577.00 0
2010-09-13 Packing Device Capped w/Cement 555.00 567.00 0
2010-09-14 Perforation 446.00 447.00 17
1973-12-17 Perforation 1790.10 1791.90 7
2010-09-14 Perforation 414.00 415.00 17
2010-09-14 Perforation 354.00 355.00 17
2010-09-14 Packing Device Capped w/Cement 354.00 552.50 0
2010-09-14 Packing Device Capped w/Cement 333.00 344.00 0
2010-09-15 Perforation 327.00 328.00 17
2010-09-15 Perforation 312.00 313.00 17
2010-09-15 Perforation 292.00 293.00 17
2010-09-15 Perforation 256.00 257.00 17
2010-09-15 Perforation 235.00 236.00 17
2010-09-15 Perforation 214.00 215.00 17
1973-12-17 Perforation 1794.70 1802.00 7
2010-09-15 Perforation 203.00 204.00 17
2010-09-15 Cement Plug 204.00 333.00 0
2010-09-15 Remedial Casing Cementing 203.00 204.00 0
2010-09-15 Packing Device Capped w/Cement 184.00 194.00 0
1973-12-17 Acid Treatment 1773.30 1802.00 0
1977-03-16 Cement Squeeze 1773.30 1791.90 0
1977-03-17 Cement Squeeze 1773.30 1791.90 0
1977-03-18 Cement Squeeze 1773.30 1791.90 0
1977-03-28 Acid Treatment 1794.70 1802.00 0
1989-06-30 Packing Device Capped w/Cement 1769.00 1770.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 338 0.0 0.0 0.0
1974 6784 0.0 0.0 0.0
1975 3242 0.0 0.0 0.0
1976 1375 0.0 0.0 0.0
1977 4443 0.0 0.0 0.0
1978 3057 0.0 0.0 0.0
1979 2222 0.0 0.0 0.0
1980 2638 0.0 0.0 0.0
1981 3163 0.0 0.0 0.0
1982 4657 0.0 0.0 0.0
1983 5784 0.0 0.0 0.0
1984 8091 0.0 0.0 0.0
1985 4182 0.0 0.0 0.0
1986 4308 0.0 0.0 0.0
1987 8537 0.0 0.0 0.0
1988 5260 0.0 0.0 0.0
1989 2652 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 349 0.0 0.0 0.0
1992 2321 0.0 0.0 0.0
1993 1956 0.0 0.0 0.0
1994 2544 0.0 0.0 0.0
1995 1949 0.0 0.0 0.0
1996 1902 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 1445 0.0 0.0 0.0
1999 2674 0.0 0.0 0.0
2000 3424 0.0 0.0 0.0
2001 8523 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 7535 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8717 0.0 0.0 0.0
2006 8447 0.0 0.0 0.0
2007 8447 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 2879 0.0 0.0 0.0

For data sources see[5]

References