X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272612000

Well Details

Well ID: 0514272612000
Loading map...
Location: 00/12-26-051-27W4/0
Location Alias: 00/12-26-51-27 W4M
Location Alias 2: 00/12-26-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 26
County/Municipality: Parkland County
Well Name: IMP GOLDEN SPIKE 12-26-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0040602
License Date: 1971-08-13
License Status: Abandoned
Spud Date: 1971-08-20
Final Drill Date: 1971-09-08
Well Total Depth: 1821.20 m
Surface Hole Latitude: 53.432499
Surface Hole Longitude: -113.882374

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-08-13 Obtained License
1971-09-04 Liner Casing Operation Performed
1971-09-08 Finished Drilling
1971-09-08 Lost Circulation Occurred
1971-09-08 Well Mode changed to Drilled and Cased
1971-10-16 Perforation Treatment Performed - Jet Perforation
1971-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-20 Well Began Production
1971-12-20 Well Fluid changed to Crude Oil
1971-12-20 Well Mode changed to Gas Lift
1978-08-02 Perforation Treatment Performed - Cement Squeeze
1978-08-03 Perforation Treatment Performed - Cement Squeeze
1978-08-04 Perforation Treatment Performed - Cement Squeeze
1978-08-11 Perforation Treatment Performed - Jet Perforation
1978-08-14 Perforation Treatment Performed - Acid Wash - No Pressure
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2009-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-18 Plug Back Performed
2009-10-18 Well Fluid changed to Crude Oil
2009-10-18 Well Mode changed to Abandoned Zone
2009-10-19 Perforation Treatment Performed - Jet Perforation
2009-10-20 Perforation Treatment Performed - Remedial Casing
2009-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-21 Perforation Treatment Performed - Jet Perforation
2009-10-21 Perforation Treatment Performed - Remedial Casing
2009-10-21 Well Log Performed
2009-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-22 Perforation Treatment Performed - Jet Perforation
2009-10-22 Perforation Treatment Performed - Remedial Casing
2009-10-22 Well Log Performed
2009-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-23 Perforation Treatment Performed - Jet Perforation
2009-10-23 Perforation Treatment Performed - Remedial Casing
2009-10-23 Well Log Performed
2011-07-21 Well Abandoned
2011-07-21 Well Fluid changed to Crude Oil
2011-07-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-10-16 Perforation 1784.30 1797.70 3
1978-08-11 Perforation 1777.00 1781.30 3
1978-08-14 Acid Wash 1777.00 1781.30 0
2009-10-18 Packing Device Capped w/Cement 1101.00 1750.00 0
2009-10-19 Perforation 600.00 601.00 17
2009-10-20 Remedial Casing Cementing 600.00 601.00 0
2009-10-21 Packing Device Capped w/Cement 578.00 594.00 0
2009-10-21 Perforation 497.00 498.00 17
2009-10-21 Remedial Casing Cementing 497.00 498.00 0
2009-10-21 Packing Device Capped w/Cement 476.00 488.00 0
2009-10-22 Perforation 310.00 311.00 17
1971-10-16 Perforation 1772.40 1781.30 3
2009-10-22 Remedial Casing Cementing 310.00 311.00 0
2009-10-22 Packing Device Capped w/Cement 291.50 301.00 0
2009-10-23 Perforation 230.00 231.00 17
2009-10-23 Remedial Casing Cementing 230.00 231.00 0
2009-10-23 Packing Device Capped w/Cement 199.50 223.50 0
1971-10-16 Perforation 1760.80 1769.40 3
1971-10-18 Acid Treatment 1784.30 1797.70 0
1971-10-19 Acid Treatment 1772.40 1781.30 0
1971-10-19 Acid Treatment 1760.80 1769.40 0
1978-08-02 Cement Squeeze 1760.80 1769.40 0
1978-08-03 Cement Squeeze 1772.40 1781.30 0
1978-08-04 Cement Squeeze 1784.30 1797.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 157 0.0 0.0 0.0
1972 7329 0.0 0.0 0.0
1973 5250 0.0 0.0 0.0
1974 581 0.0 0.0 0.0
1975 1333 0.0 0.0 0.0
1976 1173 0.0 0.0 0.0
1977 1832 0.0 0.0 0.0
1978 4068 0.0 0.0 0.0
1979 3753 0.0 0.0 0.0
1980 3913 0.0 0.0 0.0
1981 7736 0.0 0.0 0.0
1982 8623 0.0 0.0 0.0
1983 8119 0.0 0.0 0.0
1984 4668 0.0 0.0 0.0
1987 3600 0.0 0.0 0.0
1988 6980 0.0 0.0 0.0
1989 1006 0.0 0.0 0.0
1990 8420 0.0 0.0 0.0
1991 8460 0.0 0.0 0.0
1992 5547 0.0 0.0 0.0
1993 7485 0.0 0.0 0.0
1994 8643 0.0 0.0 0.0
1995 7986 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8593 0.0 0.0 0.0
1998 8707 0.0 0.0 0.0
1999 8637 0.0 0.0 0.0
2000 8156 0.0 0.0 0.0
2001 1181 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1971-09-08 Lost Circulation 1626.10 1626.10

For data sources see[6]

References