If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272701030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.426967,"lon":-113.889144,"icon":""}]} |
Location: 03/01-27-051-27W4/0 | |
Location Alias: 03/01-27-51-27 W4M | |
Location Alias 2: 03/01-27-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 27 | |
County/Municipality: Parkland County | |
Well Name: FREE REIN 103 GSPIKE 1-27-51-27 | |
Operator Name: Free Rein Resources Ltd. | |
License Number: 0008953 | |
License Date: 1955-01-03 | |
License Status: Suspension | |
Spud Date: 1955-03-31 | |
Final Drill Date: 1955-05-22 | |
Well Total Depth: 1597.20 m | |
Surface Hole Latitude: 53.426967 | |
Surface Hole Longitude: -113.889144 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1955-01-03 | Obtained License |
1955-05-22 | Finished Drilling |
1955-05-22 | Perforation Treatment Performed - Open-Hole Completion |
1955-05-22 | Production Casing Operation Performed |
1955-05-22 | Well Mode changed to Drilled and Cased |
1955-05-29 | Well Began Production |
1955-05-29 | Well Fluid changed to Crude Oil |
1955-05-29 | Well Mode changed to Flowing |
1959-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-09-12 | Well Fluid changed to Crude Oil |
1959-09-12 | Well Mode changed to Pumping |
1975-07-30 | Perforation Treatment Performed - Cement Plug |
1975-07-30 | Perforation Treatment Performed - Open-Hole Completion |
1975-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-05-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-05-07 | Perforation Treatment Performed - Jet Perforation |
1980-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-07-08 | Perforation Treatment Performed - Cement Squeeze |
1987-07-13 | Perforation Treatment Performed - Jet Perforation |
1987-07-13 | Well Log Performed |
1987-07-14 | Well Log Performed |
1987-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-12-16 | Perforation Treatment Performed - Open-Hole Completion |
1988-12-17 | Well Log Performed |
1988-12-18 | Liner Casing Operation Performed |
1988-12-18 | Perforation Treatment Performed - Cement Squeeze |
1989-01-09 | Perforation Treatment Performed - Jet Perforation |
1989-01-09 | Well Log Performed |
1989-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-02-01 | Well Began Injection |
1989-02-01 | Well Fluid changed to Water |
1989-02-01 | Well Type changed to Injection |
2008-05-01 | Well Fluid changed to Water |
2008-05-01 | Well Mode changed to Suspended |
2008-05-01 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-05-22 | Open Hole/Barefoot Completion | 1546.30 | 1550.80 | 0 |
1987-07-13 | Perforation | 1537.00 | 1540.00 | 13 |
1987-07-15 | Acid Treatment | 1537.00 | 1540.00 | 0 |
1988-12-16 | Open Hole/Barefoot Completion | 1546.30 | 1597.20 | 0 |
1988-12-18 | Cement Squeeze | 1537.00 | 1597.20 | 0 |
1989-01-09 | Perforation | 1536.40 | 1541.70 | 7 |
1989-01-09 | Perforation | 1542.90 | 1544.00 | 7 |
1989-01-09 | Perforation | 1546.10 | 1548.60 | 7 |
1989-01-09 | Perforation | 1552.10 | 1556.00 | 7 |
1989-01-11 | Acid Treatment | 1536.40 | 1556.00 | 0 |
1959-09-10 | Acid Treatment | 1546.30 | 1550.80 | 0 |
1975-07-30 | Cement Plug | 1547.50 | 1550.80 | 0 |
1975-07-30 | Open Hole/Barefoot Completion | 1546.30 | 1547.50 | 0 |
1975-07-31 | Acid Treatment | 1546.30 | 1547.50 | 0 |
1980-05-06 | Packing Device Capped w/Cement | 1542.30 | 1542.40 | 0 |
1980-05-07 | Perforation | 1540.00 | 1542.20 | 6 |
1980-05-08 | Acid Treatment | 1540.00 | 1542.20 | 0 |
1987-07-08 | Cement Squeeze | 1540.00 | 1542.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6363 | 0.0 | 0.0 | 0.0 |
1968 | 7383 | 0.0 | 0.0 | 0.0 |
1969 | 7581 | 0.0 | 0.0 | 0.0 |
1970 | 8639 | 0.0 | 0.0 | 0.0 |
1971 | 8759 | 0.0 | 0.0 | 0.0 |
1972 | 8624 | 0.0 | 0.0 | 0.0 |
1973 | 8599 | 0.0 | 0.0 | 0.0 |
1974 | 6244 | 0.0 | 0.0 | 0.0 |
1975 | 8289 | 0.0 | 0.0 | 0.0 |
1976 | 8088 | 0.0 | 0.0 | 0.0 |
1977 | 8663 | 0.0 | 0.0 | 0.0 |
1978 | 8057 | 0.0 | 0.0 | 0.0 |
1979 | 8549 | 0.0 | 0.0 | 0.0 |
1980 | 7949 | 0.0 | 0.0 | 0.0 |
1981 | 8481 | 0.0 | 0.0 | 0.0 |
1982 | 8140 | 0.0 | 0.0 | 0.0 |
1983 | 7880 | 0.0 | 0.0 | 0.0 |
1984 | 7267 | 0.0 | 0.0 | 0.0 |
1985 | 7982 | 0.0 | 0.0 | 0.0 |
1986 | 8001 | 0.0 | 0.0 | 0.0 |
1987 | 6077 | 0.0 | 0.0 | 0.0 |
1988 | 450 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]