X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514272708080

Well Details

Well ID: 0514272708080
Loading map...
Location: 08/08-27-051-27W4/0
Location Alias: 08/08-27-51-27 W4M
Location Alias 2: 08/08-27-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 27
County/Municipality: Parkland County
Well Name: ESSO GOLDEN SPIKE 8D-27-51-27
Operator Name: Imperial Oil Resources Limited
License Number: 0075035
License Date: 1979-03-23
License Status: RecCertified
Spud Date: 1979-07-24
Final Drill Date: 1979-08-10
Well Total Depth: 1825.00 m
Surface Hole Latitude: 53.430374
Surface Hole Longitude: -113.886417

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-23 Obtained License
1979-08-10 Finished Drilling
1979-08-10 Well Mode changed to Drilled and Cased
1979-08-11 Liner Casing Operation Performed
1979-08-27 Perforation Treatment Performed - Jet Perforation
1979-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-05 Well Began Production
1979-09-05 Well Fluid changed to Crude Oil
1979-09-05 Well Mode changed to Gas Lift
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Suspended
2009-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-10 Perforation Treatment Performed - Jet Perforation
2009-08-10 Plug Back Performed
2009-08-10 Well Fluid changed to Crude Oil
2009-08-10 Well Log Performed
2009-08-10 Well Mode changed to Abandoned Zone
2009-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-11 Perforation Treatment Performed - Remedial Casing
2011-08-16 Well Abandoned
2011-08-16 Well Fluid changed to Crude Oil
2011-08-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-27 Perforation 1798.50 1803.00 12
1979-08-28 Acid Treatment 1798.50 1803.00 0
2009-08-10 Packing Device Capped w/Cement 1220.00 1780.00 0
2009-08-10 Perforation 476.00 477.00 17
2009-08-11 Remedial Casing Cementing 476.00 477.00 0
2009-08-11 Packing Device Capped w/Cement 458.50 468.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1381 0.0 0.0 0.0
1980 4822 0.0 0.0 0.0
1981 3338 0.0 0.0 0.0
1982 4571 0.0 0.0 0.0
1983 7801 0.0 0.0 0.0
1984 8577 0.0 0.0 0.0
1985 8088 0.0 0.0 0.0
1986 5629 0.0 0.0 0.0
1987 7819 0.0 0.0 0.0
1988 6954 0.0 0.0 0.0
1989 8182 0.0 0.0 0.0
1990 8473 0.0 0.0 0.0
1991 4589 0.0 0.0 0.0
1992 163 0.0 0.0 0.0
1993 1522 0.0 0.0 0.0
1994 1091 0.0 0.0 0.0
1995 4852 0.0 0.0 0.0
1996 5714 0.0 0.0 0.0
1997 5297 0.0 0.0 0.0
2000 5136 0.0 0.0 0.0
2001 4352 0.0 0.0 0.0

For data sources see[5]

References