X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514273411000

Well Details

Well ID: 0514273411000
Loading map...
Location: 00/11-34-051-27W4/0
Location Alias: 00/11-34-51-27 W4M
Location Alias 2: 00/11-34-051-27 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 27
Section: 34
County/Municipality: Parkland County
Well Name: QUARRY ETAL GOLDEN SPIKE 11-34-51-27
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0002615
License Date: 1951-02-12
License Status: Suspension
Spud Date: 1951-02-23
Final Drill Date: 1951-04-23
Well Total Depth: 1834.30 m
Surface Hole Latitude: 53.448272
Surface Hole Longitude: -113.900560

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-02-12 Obtained License
1951-04-09 Liner Casing Operation Performed
1951-04-23 Finished Drilling
1951-04-23 Well Mode changed to Drilled and Cased
1951-04-27 Perforation Treatment Performed - Jet Perforation
1951-04-29 Perforation Treatment Performed - Acid Wash - No Pressure
1951-05-04 Perforation Treatment Performed - Jet Perforation
1951-05-05 Perforation Treatment Performed - Cement Squeeze
1951-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1951-05-06 Perforation Treatment Performed - Jet Perforation
1951-05-07 Perforation Treatment Performed - Jet Perforation
1951-05-22 Well Began Production
1951-05-22 Well Fluid changed to Crude Oil
1951-05-22 Well Mode changed to Pumping
1977-07-05 Perforation Treatment Performed - Jet Perforation
1977-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-06 Perforation Treatment Performed - Jet Perforation
1979-11-07 Perforation Treatment Performed - Jet Perforation
1979-11-07 Well Fluid changed to Crude Oil
1979-11-07 Well Mode changed to Abandoned Zone
1979-11-10 Drill Stem Test Performed
1979-11-11 Drill Stem Test Performed
1979-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-11-30 Perforation Treatment Performed - Jet Perforation
1983-05-03 Perforation Treatment Performed - Jet Perforation
1985-11-03 Perforation Treatment Performed - Cement Squeeze
1985-11-03 Well Log Performed
1985-11-07 Well Log Performed
1985-11-08 Perforation Treatment Performed - Abrasa-Jet Perforation
1985-11-13 Well Log Performed
1985-11-14 Perforation Treatment Performed - Cement Squeeze
1985-11-15 Perforation Treatment Performed - Jet Perforation
1985-11-15 Well Log Performed
1985-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-07 Perforation Treatment Performed - Jet Perforation
1985-12-07 Well Log Performed
1985-12-08 Well Log Performed
1985-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-27 Perforation 1829.10 1830.30 13
1979-11-06 Packing Device Capped w/Cement 1806.00 1809.00 0
1979-11-06 Perforation 1408.00 1410.00 6
1979-11-06 Perforation 1419.00 1420.00 6
1979-11-06 Perforation 1426.00 1430.50 6
1979-11-07 Perforation 1324.00 1332.00 6
1979-11-07 Perforation 1342.00 1346.00 6
1979-11-14 Packing Device Capped w/Cement 1405.00 1405.00 0
1979-11-15 Acid Treatment 1324.00 1346.00 0
1979-11-30 Perforation 1345.00 1346.00 6
1983-05-03 Perforation 1342.00 1349.00 13
1951-04-29 Acid Wash 1829.10 1830.30 0
1985-11-03 Cement Squeeze 1324.00 1349.00 0
1985-11-08 Hydra Jet Perforation 1344.00 1345.00 0
1985-11-14 Cement Squeeze 1344.00 1345.00 0
1985-11-15 Perforation 1329.00 1332.00 13
1985-11-21 Acid Treatment 1329.00 1332.00 0
1985-12-03 Acid Treatment 1329.00 1332.00 0
1985-12-07 Perforation 1308.20 1310.00 13
1985-12-07 Perforation 1318.30 1319.50 13
1985-12-07 Perforation 1321.50 1323.00 13
1985-12-07 Perforation 1324.70 1326.00 13
1951-05-04 Perforation 1832.20 1832.50 13
1985-12-09 Acid Treatment 1308.20 1326.00 0
1985-12-10 Acid Treatment 1308.20 1326.00 0
1951-05-05 Cement Squeeze 1829.10 1832.50 0
1951-05-06 Perforation 1829.10 1830.30 13
1951-05-06 Acid Wash 1829.10 1830.30 0
1951-05-07 Perforation 1832.20 1832.50 13
1977-07-05 Perforation 1824.20 1825.40 13
1977-07-06 Acid Treatment 1824.20 1825.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1458 0.0 0.0 0.0
1968 600 0.0 0.0 0.0
1969 7999 0.0 0.0 0.0
1970 7955 0.0 0.0 0.0
1971 8412 0.0 0.0 0.0
1972 8051 0.0 0.0 0.0
1973 7391 0.0 0.0 0.0
1974 1584 0.0 0.0 0.0
1975 8327 0.0 0.0 0.0
1976 8447 0.0 0.0 0.0
1977 6615 0.0 0.0 0.0
1978 4823 0.0 0.0 0.0
1979 1728 0.0 0.0 0.0

For data sources see[5]

References