If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0514273411002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.448272,"lon":-113.90056,"icon":""}]} |
| Location: 00/11-34-051-27W4/2 | |
| Location Alias: 00/11-34-51-27 W4M | |
| Location Alias 2: 00/11-34-051-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 34 | |
| County/Municipality: Parkland County | |
| Well Name: QUARRY ETAL GOLDEN SPIKE 11-34-51-27 | |
| Operator Name: Prairie Provident Resources Canada Ltd. | |
| License Number: 0002615 | |
| License Date: 1951-02-12 | |
| License Status: Suspension | |
| Spud Date: 1951-02-23 | |
| Final Drill Date: 1951-04-23 | |
| Well Total Depth: 1834.30 m | |
| Surface Hole Latitude: 53.448272 | |
| Surface Hole Longitude: -113.900560 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-02-12 | Obtained License |
| 1951-04-09 | Liner Casing Operation Performed |
| 1951-04-23 | Finished Drilling |
| 1951-04-23 | Well Mode changed to Drilled and Cased |
| 1951-04-27 | Perforation Treatment Performed - Jet Perforation |
| 1951-04-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1951-05-04 | Perforation Treatment Performed - Jet Perforation |
| 1951-05-05 | Perforation Treatment Performed - Cement Squeeze |
| 1951-05-06 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1951-05-06 | Perforation Treatment Performed - Jet Perforation |
| 1951-05-07 | Perforation Treatment Performed - Jet Perforation |
| 1977-07-05 | Perforation Treatment Performed - Jet Perforation |
| 1977-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1979-11-06 | Perforation Treatment Performed - Jet Perforation |
| 1979-11-07 | Perforation Treatment Performed - Jet Perforation |
| 1979-11-10 | Drill Stem Test Performed |
| 1979-11-11 | Drill Stem Test Performed |
| 1979-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1979-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-11-30 | Perforation Treatment Performed - Jet Perforation |
| 1981-04-07 | Well Began Production |
| 1981-04-07 | Well Fluid changed to Gas |
| 1981-04-07 | Well Mode changed to Flowing |
| 1983-05-03 | Perforation Treatment Performed - Jet Perforation |
| 1983-10-28 | Well Fluid changed to Gas |
| 1983-10-28 | Well Mode changed to Suspended |
| 1985-11-03 | Perforation Treatment Performed - Cement Squeeze |
| 1985-11-03 | Well Log Performed |
| 1985-11-07 | Well Log Performed |
| 1985-11-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1985-11-13 | Well Log Performed |
| 1985-11-14 | Perforation Treatment Performed - Cement Squeeze |
| 1985-11-15 | Perforation Treatment Performed - Jet Perforation |
| 1985-11-15 | Well Log Performed |
| 1985-11-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-07 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-07 | Well Log Performed |
| 1985-12-08 | Well Log Performed |
| 1985-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2005-02-05 | Well Fluid changed to Gas |
| 2005-02-05 | Well Mode changed to Flowing |
| 2013-09-30 | Well Fluid changed to Gas |
| 2013-09-30 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-04-27 | Perforation | 1829.10 | 1830.30 | 13 |
| 1979-11-06 | Packing Device Capped w/Cement | 1806.00 | 1809.00 | 0 |
| 1979-11-06 | Perforation | 1408.00 | 1410.00 | 6 |
| 1979-11-06 | Perforation | 1419.00 | 1420.00 | 6 |
| 1979-11-06 | Perforation | 1426.00 | 1430.50 | 6 |
| 1979-11-07 | Perforation | 1324.00 | 1332.00 | 6 |
| 1979-11-07 | Perforation | 1342.00 | 1346.00 | 6 |
| 1979-11-14 | Packing Device Capped w/Cement | 1405.00 | 1405.00 | 0 |
| 1979-11-15 | Acid Treatment | 1324.00 | 1346.00 | 0 |
| 1979-11-30 | Perforation | 1345.00 | 1346.00 | 6 |
| 1983-05-03 | Perforation | 1342.00 | 1349.00 | 13 |
| 1951-04-29 | Acid Wash | 1829.10 | 1830.30 | 0 |
| 1985-11-03 | Cement Squeeze | 1324.00 | 1349.00 | 0 |
| 1985-11-08 | Hydra Jet Perforation | 1344.00 | 1345.00 | 0 |
| 1985-11-14 | Cement Squeeze | 1344.00 | 1345.00 | 0 |
| 1985-11-15 | Perforation | 1329.00 | 1332.00 | 13 |
| 1985-11-21 | Acid Treatment | 1329.00 | 1332.00 | 0 |
| 1985-12-03 | Acid Treatment | 1329.00 | 1332.00 | 0 |
| 1985-12-07 | Perforation | 1308.20 | 1310.00 | 13 |
| 1985-12-07 | Perforation | 1318.30 | 1319.50 | 13 |
| 1985-12-07 | Perforation | 1321.50 | 1323.00 | 13 |
| 1985-12-07 | Perforation | 1324.70 | 1326.00 | 13 |
| 1951-05-04 | Perforation | 1832.20 | 1832.50 | 13 |
| 1985-12-09 | Acid Treatment | 1308.20 | 1326.00 | 0 |
| 1985-12-10 | Acid Treatment | 1308.20 | 1326.00 | 0 |
| 1951-05-05 | Cement Squeeze | 1829.10 | 1832.50 | 0 |
| 1951-05-06 | Perforation | 1829.10 | 1830.30 | 13 |
| 1951-05-06 | Acid Wash | 1829.10 | 1830.30 | 0 |
| 1951-05-07 | Perforation | 1832.20 | 1832.50 | 13 |
| 1977-07-05 | Perforation | 1824.20 | 1825.40 | 13 |
| 1977-07-06 | Acid Treatment | 1824.20 | 1825.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1981 | 6034 | 0.0 | 0.0 | 0.0 |
| 1982 | 3910 | 0.0 | 0.0 | 0.0 |
| 1983 | 2043 | 0.0 | 0.0 | 0.0 |
| 2005 | 7088 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8011 | 0.0 | 0.0 | 0.0 |
| 2008 | 8271 | 0.0 | 0.0 | 0.0 |
| 2009 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]