If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514273415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.451183,"lon":-113.895009,"icon":""}]} |
Location: 00/15-34-051-27W4/0 | |
Location Alias: 00/15-34-51-27 W4M | |
Location Alias 2: 00/15-34-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 34 | |
County/Municipality: Parkland County | |
Well Name: ANGLO GOLDEN SPIKE NO. 4 | |
Operator Name: Page Petroleum Ltd | |
License Number: 0007774 | |
License Date: 1954-03-04 | |
License Status: RecExempt | |
Spud Date: 1954-03-06 | |
Final Drill Date: 1954-05-09 | |
Well Total Depth: 1836.10 m | |
Surface Hole Latitude: 53.451183 | |
Surface Hole Longitude: -113.895009 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-03-04 | Obtained License |
1954-03-06 | Direction Drilling Operation Performed - 98 |
1954-03-13 | Drill Stem Test Performed |
1954-03-14 | Drill Stem Test Performed |
1954-04-21 | Drill Stem Test Performed |
1954-04-23 | Drill Stem Test Performed |
1954-04-24 | Drill Stem Test Performed |
1954-04-27 | Production Casing Operation Performed |
1954-05-09 | Drill Stem Test Performed |
1954-05-09 | Finished Drilling |
1954-05-09 | Well Mode changed to Drilled and Cased |
1954-05-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
1954-05-12 | Perforation Treatment Performed - Bullet Perforation |
1954-05-13 | Perforation Treatment Performed - Bullet Perforation |
1954-05-13 | Perforation Treatment Performed - Cement Squeeze |
1954-05-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1954-05-15 | Perforation Treatment Performed - Bullet Perforation |
1954-05-16 | Perforation Treatment Performed - Cement Squeeze |
1954-06-23 | Perforation Treatment Performed - Bullet Perforation |
1954-06-23 | Perforation Treatment Performed - Jet Perforation |
1954-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1954-06-26 | Perforation Treatment Performed - Cement Squeeze |
1954-06-30 | Perforation Treatment Performed - Bullet Perforation |
1954-06-30 | Perforation Treatment Performed - Jet Perforation |
1954-07-06 | Perforation Treatment Performed - Cement Squeeze |
1954-07-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
1954-07-09 | Perforation Treatment Performed - Jet Perforation |
1954-08-19 | Well Began Production |
1954-08-19 | Well Fluid changed to Crude Oil |
1954-08-19 | Well Mode changed to Pumping |
1955-08-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1969-06-30 | Well Fluid changed to Crude Oil |
1969-06-30 | Well Mode changed to Suspended |
1973-05-31 | Perforation Treatment Performed - Cement Plug |
1973-05-31 | Well Abandoned |
1973-05-31 | Well Fluid changed to Crude Oil |
1973-05-31 | Well Mode changed to Abandoned |
1973-06-04 | Perforation Treatment Performed - Cement Plug |
1973-06-05 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1954-03-06 | 993.60 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-05-12 | Bullet Perforation | 1555.40 | 1556.90 | 13 |
1954-06-24 | Acid Treatment | 1556.00 | 1557.50 | 0 |
1954-06-26 | Cement Squeeze | 1552.30 | 1557.50 | 0 |
1954-06-30 | Perforation | 1556.90 | 1558.40 | 13 |
1954-06-30 | Bullet Perforation | 1556.90 | 1558.40 | 13 |
1954-07-06 | Cement Squeeze | 1556.90 | 1558.40 | 0 |
1954-07-09 | Perforation | 1556.00 | 1556.60 | 26 |
1954-07-09 | Acid Wash | 1556.00 | 1556.60 | 0 |
1955-08-30 | Acid Wash | 1556.00 | 1556.60 | 0 |
1973-05-31 | Cement Plug | 1531.90 | 1562.40 | 0 |
1973-06-04 | Cement Plug | 899.80 | 930.20 | 0 |
1954-05-12 | Acid Wash | 1555.40 | 1556.90 | 0 |
1973-06-05 | Cement Plug | 169.20 | 172.20 | 0 |
1954-05-13 | Cement Squeeze | 1555.40 | 1556.90 | 0 |
1954-05-13 | Bullet Perforation | 1552.00 | 1552.70 | 13 |
1954-05-15 | Bullet Perforation | 1556.30 | 1557.50 | 26 |
1954-05-15 | Acid Wash | 1556.30 | 1557.50 | 0 |
1954-05-16 | Cement Squeeze | 1556.30 | 1557.50 | 0 |
1954-06-23 | Bullet Perforation | 1556.00 | 1557.50 | 13 |
1954-06-23 | Perforation | 1556.00 | 1557.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 648 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]