X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515010608003

Well Details

Well ID: 0515010608003
Loading map...
Location: 00/08-06-051-01W5/3
Location Alias: 00/08-06-51-01 W5M
Location Alias 2: 00/08-06-051-01 W5/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 01
Section: 06
County/Municipality: Parkland County
Well Name: JOURNEY LEDUC-WB 8-6-51-1
Operator Name: Journey Energy Inc.
License Number: 0131735
License Date: 1988-01-27
License Status: Suspension
Spud Date: 1988-01-29
Final Drill Date: 1988-02-05
Well Total Depth: 1505.00 m
Surface Hole Latitude: 53.372033
Surface Hole Longitude: -114.130374

For data sources see[1][2]

Well History

Date Event
1988-01-27 Obtained License
1988-01-31 Surface Casing Operation Performed
1988-02-05 Finished Drilling
1988-02-05 Well Mode changed to Drilled and Cased
1988-02-06 Drill Stem Test Performed
1988-02-06 Well Log Performed
1988-02-08 Drill Stem Test Performed
1988-02-10 Production Casing Operation Performed
1988-02-10 Rig Released
1988-02-19 Well Log Performed
1988-02-21 Perforation Treatment Performed - Jet Perforation
1988-02-21 Well Log Performed
1993-11-12 Perforation Treatment Performed - Jet Perforation
1993-11-12 Well Log Performed
1994-01-30 Perforation Treatment Performed - Jet Perforation
1994-01-30 Well Log Performed
1994-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-15 Perforation Treatment Performed - Jet Perforation
1994-08-15 Plug Back Performed
1994-08-16 Perforation Treatment Performed - Remedial Casing
1994-08-19 Well Log Performed
2000-03-15 Perforation Treatment Performed - Cement Squeeze
2000-03-15 Perforation Treatment Performed - Jet Perforation
2000-03-15 Well Log Performed
2000-03-15 Well Mode changed to Drilled and Cased
2000-03-16 Perforation Treatment Performed - Jet Perforation
2000-03-16 Well Log Performed
2000-04-20 Well Began Production
2000-04-20 Well Fluid changed to Gas
2000-04-20 Well Mode changed to Flowing
2000-07-01 Well Fluid changed to Gas
2000-07-01 Well Mode changed to Suspended
2012-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-23 Plug Back Performed
2012-09-23 Well Fluid changed to Gas
2012-09-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-21 Perforation 1462.50 1465.50 10
2000-03-15 Perforation 518.00 518.50 14
2000-03-15 Cement Squeeze 511.50 518.50 0
2000-03-16 Perforation 532.00 534.00 14
2012-09-23 Packing Device Capped w/Cement 500.00 508.00 0
1993-11-12 Perforation 1468.00 1469.50 13
1994-01-30 Perforation 1436.00 1437.00 13
1994-08-15 Packing Device Capped w/Cement 1450.00 1458.00 0
1994-08-15 Packing Device Capped w/Cement 1420.00 1428.00 0
1994-08-15 Perforation 600.00 601.00 10
1994-08-16 Remedial Casing Cementing 600.00 601.00 0
2000-03-15 Perforation 551.50 552.00 14
2000-03-15 Perforation 511.50 512.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 38 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References