X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515011609000

Well Details

Well ID: 0515011609000
Loading map...
Location: 00/09-16-051-01W5/0
Location Alias: 00/09-16-51-01 W5M
Location Alias 2: 00/09-16-051-01 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 01
Section: 16
County/Municipality: Parkland County
Well Name: L.B. - ESSO NO. 1
Operator Name: Imperial Oil Resources Limited
License Number: 0008138
License Date: 1954-06-21
License Status: RecCertified
Spud Date: 1954-08-24
Final Drill Date: 1954-10-04
Well Total Depth: 2088.50 m
Surface Hole Latitude: 53.404824
Surface Hole Longitude: -114.078792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-21 Obtained License
1954-09-06 Drill Stem Test Performed
1954-09-14 Drill Stem Test Performed
1954-09-16 Drill Stem Test Performed
1954-09-25 Drill Stem Test Performed
1954-10-04 Finished Drilling
1954-10-07 Production Casing Operation Performed
1954-10-21 Perforation Treatment Performed - Bullet Perforation
1954-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-22 Perforation Treatment Performed - Fractured
1954-10-22 Well Mode changed to Drilled and Cased
1955-06-29 Perforation Treatment Performed - Cement Squeeze
1955-07-01 Perforation Treatment Performed - Bullet Perforation
1955-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-07-25 Perforation Treatment Performed - Acid Wash - No Pressure
1994-02-01 Well Began Production
1994-02-01 Well Fluid changed to Gas
1994-02-01 Well Mode changed to Flowing
1995-03-14 Well Fluid changed to Gas
1995-03-14 Well Mode changed to Suspended
1996-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-12 Perforation Treatment Performed - Jet Perforation
1996-09-12 Perforation Treatment Performed - Remedial Casing
1996-09-12 Plug Back Performed
1996-09-12 Well Log Performed
1996-10-10 Well Abandoned
1996-10-10 Well Fluid changed to Gas
1996-10-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-10-21 Bullet Perforation 1452.10 1452.70 20
1996-09-12 Perforation 301.00 302.00 13
1996-09-12 Remedial Casing Cementing 301.00 302.00 0
1996-09-12 Packing Device Capped w/Cement 0.10 307.00 0
1954-10-21 Bullet Perforation 1452.70 1453.60 39
1954-10-22 Acid Treatment 1452.10 1453.60 0
1954-10-22 Fracture 1452.10 1453.60 0
1955-06-29 Cement Squeeze 1452.10 1453.60 0
1955-07-01 Bullet Perforation 1452.10 1455.10 20
1955-07-03 Acid Treatment 1452.10 1455.10 0
1955-07-25 Acid Wash 1452.10 1455.10 0
1996-09-12 Packing Device Capped w/Cement 1426.70 1434.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 125 0.0 0.0 0.0
1994 2057 0.0 0.0 0.0

For data sources see[5]

References