X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515041008000

Well Details

Well ID: 0515041008000
Loading map...
Location: 00/08-10-051-04W5/0
Location Alias: 00/08-10-51-04 W5M
Location Alias 2: 00/08-10-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 10
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 8-10-51-4
Operator Name: New Star Energy Ltd.
License Number: 0081491
License Date: 1980-03-04
License Status: Suspension
Spud Date: 1980-03-07
Final Drill Date: 1980-03-13
Well Total Depth: 1607.00 m
Surface Hole Latitude: 53.385630
Surface Hole Longitude: -114.498418

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-04 Obtained License
1980-03-13 Finished Drilling
1980-03-13 Well Mode changed to Drilled and Cased
1980-03-14 Drill Stem Test Performed
1980-03-15 Drill Stem Test Performed
1980-03-16 Production Casing Operation Performed
1980-05-06 Perforation Treatment Performed - Jet Perforation
1980-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-15 Perforation Treatment Performed - Fractured
1980-05-23 Well Began Production
1980-05-23 Well Fluid changed to Crude Oil
1980-05-23 Well Mode changed to Flowing
1985-10-27 Well Fluid changed to Crude Oil
1985-10-27 Well Mode changed to Pumping
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Suspended
2000-04-15 Well Fluid changed to Crude Oil
2000-04-15 Well Mode changed to Pumping
2014-11-13 Perforation Treatment Performed - Cement Squeeze
2014-11-13 Plug Back Performed
2014-11-13 Well Fluid changed to Crude Oil
2014-11-13 Well Mode changed to Abandoned Zone
2014-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-16 Plug Back Performed
2014-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-17 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-06 Perforation 1553.30 1558.00 12
1980-05-07 Acid Treatment 1553.30 1558.00 0
1980-05-15 Fracture 1553.30 1558.00 0
2014-11-13 Cement Squeeze 1553.30 1558.00 0
2014-11-16 Packing Device Capped w/Cement 806.00 807.00 0
2014-11-17 Packing Device Capped w/Cement 233.50 234.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 725 0.0 0.0 0.0
1981 971 0.0 0.0 0.0
1982 2669 0.0 0.0 0.0
1983 6174 0.0 0.0 0.0
1984 6857 0.0 0.0 0.0
1985 6823 0.0 0.0 0.0
1986 5804 0.0 0.0 0.0
1987 1320 0.0 0.0 0.0
2000 5605 0.0 0.0 0.0
2001 7312 0.0 0.0 0.0
2002 8129 0.0 0.0 0.0
2003 6311 0.0 0.0 0.0
2004 7993 0.0 0.0 0.0
2005 7334 0.0 0.0 0.0
2006 7135 0.0 0.0 0.0
2007 7594 0.0 0.0 0.0
2008 7969 0.0 0.0 0.0
2009 7992 0.0 0.0 0.0
2010 7624 0.0 0.0 0.0
2011 8161 0.0 0.0 0.0
2012 7574 0.0 0.0 0.0
2013 7516 0.0 0.0 0.0
2014 3926 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References