X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515041614000

Well Details

Well ID: 0515041614000
Loading map...
Location: 00/14-16-051-04W5/0
Location Alias: 00/14-16-51-04 W5M
Location Alias 2: 00/14-16-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 16
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 14-16-51-4
Operator Name: New Star Energy Ltd.
License Number: 0097582
License Date: 1982-09-27
License Status: Amended
Spud Date: 1982-10-10
Final Drill Date: 1982-10-17
Well Total Depth: 1163.00 m
Surface Hole Latitude: 53.409945
Surface Hole Longitude: -114.533166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-27 Obtained License
1982-10-14 Production Casing Operation Performed
1982-10-17 Finished Drilling
1982-10-17 Well Mode changed to Drilled and Cased
1982-10-29 Perforation Treatment Performed - Open-Hole Completion
1982-10-30 Perforation Treatment Performed - Jet Perforation
1982-10-31 Perforation Treatment Performed - Jet Perforation
1982-11-01 Well Began Production
1982-11-01 Well Fluid changed to Crude Oil
1982-11-01 Well Mode changed to Pumping
1983-07-21 Perforation Treatment Performed - Cement Plug
1983-07-21 Perforation Treatment Performed - Jet Perforation
1983-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-24 Perforation Treatment Performed - Chemical Squeeze
1983-09-12 Well Began Injection
1983-09-12 Well Fluid changed to Water
1983-09-12 Well Type changed to Injection
1990-03-17 Liner Casing Operation Performed
1990-03-17 Perforation Treatment Performed - Cement Squeeze
1990-03-17 Well Fluid changed to Water
1990-03-17 Well Mode changed to Abandoned Zone
1990-03-17 Well Type changed to Injection
2002-04-09 Well Log Performed
2002-04-10 Well Log Performed
2002-04-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-29 Open Hole/Barefoot Completion 1145.00 1152.60 13
1982-10-30 Perforation 1142.50 1144.00 13
1982-10-31 Perforation 1134.00 1141.00 13
1983-07-21 Cement Plug 1143.00 1152.60 0
1983-07-21 Perforation 1139.00 1141.00 13
1983-07-22 Acid Treatment 1139.00 1141.00 0
1983-07-24 Chemical Squeeze 1139.00 1141.00 0
1990-03-17 Cement Squeeze 1139.00 1143.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 970 0.0 0.0 0.0
1983 1176 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0

For data sources see[5]

References