X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515041614002

Well Details

Well ID: 0515041614002
Loading map...
Location: 00/14-16-051-04W5/2
Location Alias: 00/14-16-51-04 W5M
Location Alias 2: 00/14-16-051-04 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 16
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 14-16-51-4
Operator Name: New Star Energy Ltd.
License Number: 0097582
License Date: 1982-09-27
License Status: Amended
Spud Date: 1982-10-10
Final Drill Date: 1990-03-14
Well Total Depth: 1628.00 m
Surface Hole Latitude: 53.409945
Surface Hole Longitude: -114.533166

For data sources see[1][2]

Well History

Date Event
1982-09-27 Obtained License
1982-10-14 Intermediate Casing Operation Performed
1990-03-14 Finished Drilling
1990-03-14 Well Mode changed to Drilled and Cased
1990-03-15 Drill Stem Test Performed
1990-03-15 Well Log Performed
1990-03-16 Drill Stem Test Performed
1990-03-17 Liner Casing Operation Performed
1990-03-17 Rig Released
1990-05-09 Well Log Performed
1990-05-11 Perforation Treatment Performed - Jet Perforation
1990-05-11 Well Log Performed
1990-05-18 Well Began Production
1990-05-18 Well Fluid changed to Crude Oil
1990-05-18 Well Mode changed to Pumping
1992-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-04-09 Perforation Treatment Performed - Jet Perforation
2002-04-10 Perforation Treatment Performed - Jet Perforation
2002-04-12 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-05-11 Perforation 1594.00 1599.70 13
1990-05-11 Perforation 1601.00 1603.00 13
1992-05-01 Acid Treatment 1594.00 1603.00 0
2002-04-09 Perforation 1390.50 1393.00 14
2002-04-10 Perforation 1381.00 1383.00 17
2002-04-12 Cement Squeeze 1381.00 1393.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3735 0.0 0.0 0.0
1991 8442 0.0 0.0 0.0
1992 8366 0.0 0.0 0.0
1993 8744 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 7931 0.0 0.0 0.0
1996 8026 0.0 0.0 0.0
1997 8553 0.0 0.0 0.0
1998 7239 0.0 0.0 0.0
1999 8479 0.0 0.0 0.0
2000 8589 0.0 0.0 0.0
2001 8596 0.0 0.0 0.0
2002 8055 0.0 0.0 0.0
2003 8387 0.0 0.0 0.0
2004 8471 0.0 0.0 0.0
2005 8184 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7992 0.0 0.0 0.0
2008 7871 0.0 0.0 0.0
2009 8093 0.0 0.0 0.0
2010 7368 0.0 0.0 0.0
2011 8695 0.0 0.0 0.0
2012 8123 0.0 0.0 0.0
2013 8522 0.0 0.0 0.0
2014 8579 0.0 0.0 0.0
2015 8589 0.0 0.0 0.0
2016 8650 0.0 0.0 0.0
2017 8407 0.0 0.0 0.0
2018 8672 0.0 0.0 0.0
2019 8147 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References