X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515041808000

Well Details

Well ID: 0515041808000
Loading map...
Location: 00/08-18-051-04W5/0
Location Alias: 00/08-18-51-04 W5M
Location Alias 2: 00/08-18-051-04 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 04
Section: 18
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 8-18-51-4
Operator Name: Canadian Natural Resources Limited
License Number: 0094187
License Date: 1981-12-31
License Status: RecCertified
Spud Date: 1982-01-06
Final Drill Date: 1982-01-14
Well Total Depth: 1655.00 m
Surface Hole Latitude: 53.402662
Surface Hole Longitude: -114.568080

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-12-31 Obtained License
1982-01-14 Finished Drilling
1982-01-14 Well Mode changed to Drilled and Cased
1982-01-15 Drill Stem Test Performed
1982-01-17 Production Casing Operation Performed
1982-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-28 Perforation Treatment Performed - Jet Perforation
1982-01-31 Perforation Treatment Performed - Jet Perforation
1982-02-01 Perforation Treatment Performed - Cement Squeeze
1982-02-03 Perforation Treatment Performed - Jet Perforation
1982-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-08 Perforation Treatment Performed - Jet Perforation
1982-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-09 Perforation Treatment Performed - Cement Squeeze
1982-02-10 Perforation Treatment Performed - Jet Perforation
1982-02-18 Perforation Treatment Performed - Fractured
1982-03-15 Perforation Treatment Performed - Cement Squeeze
1982-03-18 Perforation Treatment Performed - Jet Perforation
1982-03-18 Well Began Production
1982-03-18 Well Fluid changed to Crude Oil
1982-03-18 Well Mode changed to Pumping
1982-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-16 Well Fluid changed to Crude Oil
1982-05-16 Well Mode changed to Suspended
1984-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-01 Plug Back Performed
1984-09-01 Well Log Performed
1985-12-03 Well Log Performed
1985-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-04 Plug Back Performed
1985-12-04 Well Abandoned
1985-12-04 Well Fluid changed to Crude Oil
1985-12-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-28 Perforation 1593.50 1595.50 13
1982-02-10 Perforation 1130.00 1132.50 13
1982-02-18 Fracture 1130.00 1132.50 0
1982-03-15 Cement Squeeze 1130.00 1132.50 0
1982-03-18 Perforation 1130.00 1132.50 13
1982-03-18 Perforation 1593.00 1594.50 13
1982-03-19 Acid Treatment 1593.00 1594.50 0
1984-09-01 Packing Device Capped w/Cement 1580.00 1588.00 0
1985-12-04 Packing Device Capped w/Cement 1116.00 1124.00 0
1982-01-28 Acid Treatment 1593.50 1595.50 0
1982-01-31 Perforation 1596.50 1598.50 13
1982-02-01 Cement Squeeze 1596.50 1598.50 0
1982-02-03 Perforation 1593.50 1595.00 13
1982-02-04 Acid Treatment 1593.50 1595.00 0
1982-02-08 Perforation 1596.50 1599.50 13
1982-02-09 Acid Treatment 1593.00 1599.50 0
1982-02-09 Cement Squeeze 1593.00 1599.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 738 0.0 0.0 0.0

For data sources see[5]

References