If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0515042815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.431862,"lon":-114.531515,"icon":""}]} |
Location: 00/15-28-051-04W5/0 | |
Location Alias: 00/15-28-51-04 W5M | |
Location Alias 2: 00/15-28-051-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 5 | |
Range: 04 | |
Section: 28 | |
County/Municipality: Parkland County | |
Well Name: NEW STAR HIGHVALE 15-28-51-4 | |
Operator Name: New Star Energy Ltd. | |
License Number: 0437203 | |
License Date: 2011-09-27 | |
License Status: Suspension | |
Spud Date: 2011-10-04 | |
Final Drill Date: 2011-10-16 | |
Well Total Depth: 2337.00 m | |
Surface Hole Latitude: 53.431862 | |
Surface Hole Longitude: -114.531515 |
Date | Event |
---|---|
2011-09-27 | Obtained License |
2011-10-05 | Surface Casing Operation Performed |
2011-10-08 | Direction Drilling Operation Performed - Deviate |
2011-10-08 | Well Log Performed |
2011-10-11 | Direction Drilling Operation Performed - Horizontal |
2011-10-12 | Intermediate Casing Operation Performed |
2011-10-14 | Well Log Performed |
2011-10-16 | Finished Drilling |
2011-10-16 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-16 | Well Mode changed to Drilled and Cased |
2011-10-17 | Rig Released |
2011-11-22 | Well Began Production |
2011-11-22 | Well Fluid changed to Crude Oil |
2011-11-22 | Well Mode changed to Pumping |
2012-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-03-02 | Well Fluid changed to Crude Oil |
2012-03-02 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-08 | 1340.00 | Deviate (5 - 79 degrees) |
2011-10-11 | 1671.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-16 | Open Hole/Barefoot Completion | 1724.00 | 2337.00 | 0 |
2012-02-06 | Acid Treatment | 2050.00 | 2330.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 809 | 0.0 | 0.0 | 0.0 |
2012 | 1166 | 0.0 | 0.0 | 0.0 |
For data sources see[6]